Intumescent Fire Coating & Paint for Exposed Structural Steel 1 to 3 Hour CAN/ULC-S101 Ratings in Toronto & Ontario
2026 Quick Summary & Ballpark Cost
2026 Ontario Structural Intumescent Coating & Paint Cost Summary: Commercial thin-film intumescent fire coating and intumescent paint for structural steel (CSI Division 07 81 23) installed by Sprayfoam Solutions Toronto Inc. across Toronto, Mississauga, Brampton, Vaughan, Markham, Oakville, and across Ontario costs $6.50–$12.50/sq ft for 1-hour interior water-based ratings, $10.50–$18.50+/sq ft for 2-to-3-hour AESS or epoxy systems, and $4.95–$9.75/sq ft for fire-retardant wood and Mass Timber encapsulation. Our Caliber Certified (CAN/ULC-S705.2 Licensed) Installers and structural fireproofing crews apply Carboline Nullifire®, Sherwin-Williams Firetex®, AD Firefilm® & other ULC-listed structural fireproofing systems tested to CAN/ULC-S101, S102 & S146 and verified via ASTM E3108 digital magnetic DFT gauges. Call (647) 333-3626 or get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds at spfsolutions.ca/price-chat (No Site Visit Required).
Why Ontario Architects, Structural Engineers & General Contractors Specify Our Team
AESS Category 1 to 4 Smooth Architectural Finish in Any Colour
Applied with precision high-pressure airless plural equipment and finished with ULC-approved polyurethane topcoats matched to any RAL, Sherwin-Williams, or Benjamin Moore colour in matte, satin, or semi-gloss.
1 to 3 Hour CAN/ULC-S101 Steel & CAN/ULC-S146 Mass Timber Ratings
During a fire, thin-film intumescent coatings expand 15x to 50x into a dense insulating ceramic-carbon char that shields structural steel below its 538°C critical yield threshold for up to 3 hours.
Before spraying a single mil, we verify shop-primer chemistry and DFT against the manufacturer’s ULC Design listing (Z600 / X600 / BXUVc) so your 3-coat system passes engineering review without adhesion failure.
Digital Elcometer ASTM E3108 DFT Verification & Submittal Binder
Every structural member is mapped and logged with calibrated digital magnetic Dry Film Thickness (DFT) gauges per ASTM E3108, complete with batch numbers and environmental dew-point logs.
We calculate exact W/D (wide-flange) and A/P (hollow HSS) section factors from your structural drawings and submit a member-by-member required Dry Film Thickness (DFT) schedule.
2
SSPC Surface Prep & Primer Compatibility Audit
Steel is inspected for SSPC-SP6 commercial blast cleanliness, solvent-wiped, and tested for shop-primer DFT and chemical compatibility. Incompatible or bare steel receives a ULC-listed tie-coat primer.
Our certified applicators spray controlled multi-coat passes of thin-film intumescent mastic, monitoring ambient humidity, steel temperature (>3°C above dew point), and wet mils on every pass.
4
ASTM E3108 Digital DFT Audit & Architectural Topcoat
Once cured intumescent DFT is verified with digital Elcometer magnetic gauges, we apply the ULC-approved decorative urethane topcoat and issue your signed engineering closeout binder.
Interactive ULC Structural Assemblies
CAN/ULC-S101 Structural Steel & Concrete Fireproofing Explorer
* Under CAN/ULC-S101 fire exposure (900°C+), our fireproofing shield insulates the structural steel core below its critical 538°C (1,000°F) yield-loss threshold for 1 to 4 hours.
1-Hour to 4-Hour structural load-bearing steel protection preventing critical 538°C (1,000°F) yield-strength collapse under CAN/ULC-S101.
Division 07 81 00 — Cementitious Fireproofing (SFRM) Spec1/2" to 2-1/4" Isolatek Cafco® 300 / Blaze-Shield® II or GCP Monokote® MK-6® (15–22 lb/ft³) contour-sprayed to match member W/D section factor.
Division 07 81 23 — Thin-Film Intumescent Fire Coating Spec35 to 145 mils DFT Carboline Nullifire® / Thermo-Lag®, Sherwin-Williams Firetex® or AD Firefilm® III thin-film mastic over compatible primer.
Third-Party Field QA/QC & Engineer Verification ProtocolASTM E605 Thickness/Density + ASTM E736 Bond Strength (SFRM) • ASTM E3108 Digital Magnetic DFT Log (Intumescent) for engineer sign-off.
In-Depth: Intumescent Fire Coating for Structural Steel
5 min read
MATCHING INTUMESCENT FINISH TO CISC AESS CATEGORIES
We align our surface preparation, airless spray tip selection, and inter-coat sanding with the Canadian Institute of Steel Construction (CISC) AESS Categories:
Every structural intumescent installation under CAN/ULC-S101 is an engineered 3-part chemical system:
Layer 1 — Qualified Anti-Corrosive Primer (2–4 mils DFT): Phenalkamine epoxy, polyamide epoxy, or zinc-rich primer tested specifically for high-temperature char retention over SSPC-SP6 blasted steel.
Layer 2 — Intumescent Basecoat Mastic (25–160+ mils DFT): Contains ammonium polyphosphate (acid catalyst), pentaerythritol (carbon donor), and melamine (blowing agent) that expand up to 50x at 200°C–250°C.
Layer 3 — Decorative & Environmental Topcoat (2–4 mils DFT): ULC-tested polyurethane or silicone-alkyd finish coat sealing against humidity, UV, and abrasion in your exact architectural colour.
DIGITAL ELCOMETER DFT VERIFICATION & SUBMITTAL LOGS
Architects and third-party inspection engineers require mathematical proof that every structural member meets its ULC Design assembly thickness:
Shop Primer Baseline Subtracted: We measure and record existing shop-primer DFT before intumescent application so net intumescent build is 100% accurate.
Statistical Bay & Flange Mapping (SSPC-PA 2 / ASTM E3108): Digital magnetic readings taken across webs, inner/outer flanges, and HSS faces.
Complete Closeout Binder: Includes ULC Design certificates, batch-lot numbers, ambient temp/RH/dew-point logs, and signed DFT reports for immediate municipal occupancy sign-off.
WHEN TO SPECIFY DIVISION 07 81 23 vs. DIVISION 07 81 00
How much does thin-film intumescent fire coating for structural steel cost per sq ft in Ontario in 2026?
In 2026 across Toronto, Mississauga, Brampton, Vaughan, Markham, Oakville, and across Ontario, commercial thin-film intumescent fire coating (CSI Division 07 81 23) for 1-hour and 2-hour CAN/ULC-S101 AESS structural steel installed by Sprayfoam Solutions Toronto Inc. costs $6.50 to $11.50 per sq ft for 1-hour interior water-borne applications, $10.50 to $15.75 per sq ft for 2-hour architectural AESS assemblies with custom colour topcoats, and $13.50 to $18.50+ per sq ft for 2-to-3-hour fast-cure hybrid or 2-component epoxy exterior systems using Carboline Nullifire®, Sherwin-Williams Firetex® & other ULC-listed structural fireproofing systems applied by our Caliber Certified (CAN/ULC-S705.2 Licensed) Installers and fireproofing teams. Call (647) 333-3626 or get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds at spfsolutions.ca/price-chat (No Site Visit Required).
What is the difference between Structural Steel Intumescent Coating (CAN/ULC-S101) and DC315 (CAN/ULC-S124)?
Structural steel thin-film intumescent coatings (Division 07 81 23) are tested under CAN/ULC-S101 at high dry film builds (25 to 180+ mils DFT) to keep load-bearing steel columns, W-beams, and trusses below their 538°C collapse temperature for 1 to 3 hours. IFTI DC315® (/fire-coating-dc315) is tested under CAN/ULC-S124 at 12–14 mils DFT specifically as a 15-minute thermal barrier over spray polyurethane foam insulation. Our certified crews install both systems.
Why do Hollow Structural Sections (HSS columns) require thicker intumescent coating than W-shape I-beams?
Because hollow round or square HSS columns are heated from all four exterior sides and lack an interior web mass to absorb heat, their Area-to-Perimeter (A/P) section factor heats up faster in a CAN/ULC-S101 furnace test than a wide-flange W-shape beam of equivalent weight. Our estimators calculate exact W/D and A/P ratios for every steel member on your structural drawings so each column and beam receives its exact ULC-certified mil build.
Can you topcoat intumescent fireproofing in custom architectural colours like matte black, white, or RAL shades?
Yes. Once our certified applicators verify that the cured intumescent basecoat meets the required Dry Film Thickness (DFT) via digital Elcometer gauges, we spray a ULC-approved polyurethane or acrylic decorative topcoat in any custom RAL, Sherwin-Williams, or Benjamin Moore colour (matte, satin, or semi-gloss) to match the architect’s exact AESS design intent.
Why does shop-primer compatibility matter before applying intumescent fire coating?
During a building fire, an intumescent coating swells up to 50x its thickness and exerts strong pull forces on the underlying steel primer. If the structural steel fabricator applied an unapproved alkyd shop primer or applied primer too thickly (> 5 mils DFT), the intumescent char can delaminate during a fire—and third-party inspectors will reject the assembly. We audit shop primer chemistry and adhesion before application and apply a ULC-approved tie-coat primer whenever required.
How is thin-film intumescent fireproofing inspected for municipal occupancy in Ontario?
Unlike cementitious SFRM (which uses pin gauges under ASTM E605), thin-film intumescent coatings are inspected under ASTM E3108 and SSPC-PA 2 using calibrated digital magnetic Dry Film Thickness (DFT) gauges (such as the Elcometer 456). We record primer DFT, intumescent DFT, and topcoat DFT for every beam and column so your third-party engineer and municipal building official sign off immediately.
Which structural intumescent fire coating brands do you install in Ontario?
We install all leading ULC-listed Division 07 81 23 intumescent systems in Canada, including Carboline Nullifire® SC902 / Thermo-Lag® 3000 / A/D Firefilm® III (ADFI SprayFilm), Sherwin-Williams Firetex® FX6002 / FX9502 / M90, Flame Control®, International® Chartek® / Interchar® & other ULC-listed structural fireproofing systems.
Do you also apply fire-retardant coatings to Mass Timber, CLT, and Glulam structures?
Yes. For commercial Mass Timber, Cross-Laminated Timber (CLT), and Glulam beams requiring flame-spread reduction (CAN/ULC-S102) or encapsulation ratings (CAN/ULC-S146) under the Ontario Building Code, we apply both clear architectural intumescent varnishes and pigmented fire-retardant coatings.
Trusted by Ontario's top builders, general contractors & homeowners.
Certified Installation & On-Time Delivery
5.0(45+ Google Reviews)
“We had 20,000 sq ft of our logistics warehouse insulated with closed-cell spray foam. The building condensation is completely gone. Their commercial rig handled the project in just three days without interrupting our daily operations.”
Amit P.
Mississauga, ON
Facilities DirectorCommercialWarehouse Insulation
“They insulated a retail commercial building envelope for us. High-performance closed-cell foam acted as both insulation and vapor barrier. Excellent scheduling and pass on code inspection. Highly professional.”
Rajesh S.
Etobicoke, Toronto
General ContractorCommercialCommercial Spray Foam
“Used them for a multi-unit commercial project. They applied closed-cell spray foam on metal stud walls. Passed building code on the first inspection. Clean framing and no overspray. Excellent partner.”
Priya K.
Vaughan, ON
BuilderCommercialOffice Building Insulation
“Critical temperature control was required for our food distribution warehouse. They sprayed closed-cell foam on the ceiling and walls. Amazing condensation control and thermal barrier. Professional commercial crew.”
“We hired them to insulate a large steel commercial building. The closed-cell spray foam bonds perfectly to metal panels, stopping rust and drafts. Excellent WSIB-compliant, licensed crew.”
Fatima Z.
Markham, ON
Project ManagerCommercialMetal Building Insulation
“They sprayed our large farm workshop and barn walls. Condensation was ruining our equipment. Now the barn is draft-free and dry. Great commercial rates and top quality. Highly recommended.”
Vikram M.
Barrie, ON
Project ManagerCommercialAgricultural Spray Foam
“We use their commercial services for all our industrial buildings. Their rigs are top-of-the-line, and their installers are Caliber Certified (CAN/ULC-S705.2 licensed). Passed building inspections first try.”
Rohan D.
Hamilton, ON
BuilderCommercialCommercial Spray Foam
“Insulated a commercial property crawl space to stop drafts rising into offices. Polyurethane closed-cell foam was applied flawlessly. Punctual crew, WSIB insured, $5M liability coverage. Highly recommended.”
Tariq H.
Oakville, ON
Property ManagerCommercialCommercial Crawl Space
“Professional warehouse insulation project. They covered all our stock with plastic sheeting before spraying. Clean, code-compliant, and on-schedule. Our HVAC energy bills dropped by 35%.”
Yasmin R.
Pickering, ON
Facilities DirectorCommercialWarehouse Insulation
“Hired them to fix condensation in an industrial steel warehouse. Closed-cell spray foam solved the problem completely and added structural rigidity to the metal siding. Outstanding service.”
Sanjay G.
Kitchener, ON
General ContractorCommercialMetal Building Insulation
“Insulated four exterior industrial storage tanks using CCMC-approved closed-cell polyurethane foam. The thermal performance is exceptional. Safe mobilization, certified crews, and zero safety issues.”
Anjali V.
London, ON
Facilities DirectorCommercialSilo & Tank Insulation
“We needed custom shipping containers insulated for mobile office use. They sprayed 2 inches of closed-cell foam on the interior walls. No condensation, perfectly flat finish. Passed inspection easily.”
“Hired them to insulate a multi-story apartment building renovation. Spanning five floors, they completed the wall and floor assemblies on schedule. Professional, fully insured, and CCMC certified.”
“Excellent commercial insulation partner. We use them for all our steel-frame developments. Their high-output mobile rigs are fast, and the foam thickness is highly consistent. Excellent rates.”
Wei Z.
Vaughan, ON
General ContractorCommercialCommercial Spray Foam
“They insulated our older commercial warehouse ceiling. Closed-cell spray foam sealed all the deck joints and stopped winter drafts. We noticed a major reduction in gas bills.”
Ying H.
Brampton, ON
Facilities DirectorCommercialWarehouse Retrofit
“Hired Sprayfoam Solutions to restore our warehouse roof using a hybrid flat roof spray foam and silicone roof coating. No tear-off was required, saving us over $40,000 compared to a traditional roof replacement. The roof is 100% waterproof and reflects heat perfectly.”
“Our commercial flat roof was constantly leaking. They applied high-density spray foam and a high-solids silicone coating. It created a seamless, ponding-water resistant membrane. The project was completed on budget with zero downtime for our tenants.”
Linh N.
Mississauga, ON
Property ManagerCommercialFlat Roof Restoration
“Saved our commercial roof without a costly tear-off. They repaired the leaks and applied a reflective silicone coating. Rooftop temperatures dropped significantly, lowering our summer AC costs. Excellent service.”
“Outstanding roof restoration project. They applied 3lb high-density spray foam directly over our old membrane. Sealed every roof penetration perfectly. Excellent certified crew, WSIB insured.”
Min-Ji K.
Brampton, ON
Project ManagerCommercialCommercial Flat Roof
“Professional flat roof restoration. Seamless foam and silicone coating has stopped all leaks and significantly improved the building insulation. Professional, licensed team, and competitive pricing.”
Hao T.
Markham, ON
Property ManagerCommercialFlat Roof Restoration
“Great flat roof coating service. They performed a thermal scan to locate wet insulation, replaced those sections, and coated the roof with reflective silicone. 100% leak-proof and energy efficient.”
“Insulated and waterproofed our industrial plaza flat roof. Seamless high-density foam stops drafts and water leaks in one shot. Certified installers using CCMC-approved roofing systems.”
Kevin C.
Hamilton, ON
Project ManagerCommercialFlat Roof Spray Foam
“Professional, certified crews. They did a marvelous job applying silicone coating on our warehouse flat roof. Complete ponding water resistance and 20-year durability. Excellent work.”
“We have used them for two flat roof restorations now. High-density spray foam followed by white reflective silicone. Tenants reported immediate comfort improvements. No leaks, highly recommended.”
“Restored our retail store flat roof without interrupting business. Seamless spray foam and silicone coating has survived two harsh winters with zero issues. Great warranties and WSIB insured.”
“Excellent roof restoration service. Thermal scan was done first to ensure no wet insulation was covered. The silicone coating application was very clean with no overspray on surrounding cars.”
Stephanie L.
London, ON
Project ManagerCommercialSilicone Roof Coating
“High-density polyurethane foam and reflective coating applied on our manufacturing facility roof. Lowered our cooling costs by 20% last summer. Excellent service, clean, and highly professional.”
Ronald K.
Vaughan, ON
Facilities DirectorCommercialFlat Roof Spray Foam
“We needed a certified 15-minute thermal barrier for a large commercial permit. Their DC315 application was flawlessly done, meeting all Building Code compliance standards on the first inspection. They provided full wet film thickness documentation.”
Rebecca P.
Scarborough, Toronto
General ContractorCommercialDC315 Fire Coating
“Highest rated fireproofing team in the GTA. They arrived within 48 hours for a CAN/ULC-S124 compliant intumescent coating project in a basement suite. The documentation provided was exactly what the inspector needed.”
Anthony G.
Mississauga, ON
General ContractorResidentialSpray Foam & DC315
“We use Sprayfoam Solutions for all our exposed spray foam projects. They apply the closed-cell foam and the DC315 fire coating on the same day—one crew, one mobilization. Saves time and framing stays clean.”
Laura J.
Vaughan, ON
BuilderResidentialDC315 Thermal Barrier
“Highly professional DC315 intumescent coating application on exposed spray foam in our mechanical rooms. The crew verified wet film thickness (WFT) continuously and left a spotless workspace. Passed inspection.”
Albert N.
Brampton, ON
Project ManagerCommercialDC315 Fire Coating
“Ontario Building Code requires a thermal barrier over exposed basement spray foam. Their DC315 application was fast and certified. They provided the CCMC evaluation report immediately for our permit file.”
Cynthia O.
Markham, ON
BuilderResidentialThermal Barrier Code Compliance
“They applied DC315 fire coating over exposed spray foam in an attic storage area. Passed building code inspection first try. Certified applicator, WSIB insured, and same-week scheduling. Excellent.”
Ryan S.
Oakville, ON
General ContractorCommercialDC315 Fire Coating
“We hire them for all our legal duplex conversions. They spray the closed-cell insulation and follow up with DC315 intumescent coating for code-compliant fire safety. Fast, neat, and highly professional.”
Kathleen D.
Hamilton, ON
BuilderResidentialSpray Foam & Fire Coating
“Excellent experience. Certified DC315 application over foam in a commercial mechanical loft. Passed inspection easily. They provided a full documentation package with CCMC evaluation reports.”
Justin F.
Barrie, ON
General ContractorCommercialDC315 Thermal Barrier
“We needed a 15-minute thermal barrier in an unfinished basement remodel. They sprayed the closed-cell foam and followed up with code-compliant DC315 fire coating. Passed building permit inspection.”
Amy W.
Kitchener, ON
BuilderResidentialDuplex Code Compliance
“Certified intumescent fire paint over spray foam. The application was clean with no overspray on steel beams or electrical runs. The crew was professional, polite, and fully WSIB insured.”
Brandon H.
London, ON
General ContractorCommercialDC315 Fire Coating
“Passed our building inspection with flying colors. The DC315 application met the 15-minute thermal barrier requirements under the Ontario building code. Highly professional service and documentation.”
Shirley A.
Oshawa, ON
General ContractorCommercialExposed Foam Fire Code
“Excellent duplex conversion project. They applied closed-cell spray foam and DC315 fire coating in the mechanical room. Outstanding coordination, clean work, and complete code compliance.”
Frank T.
East York, Toronto
BuilderResidentialDC315 Thermal Barrier
“Professional fire barrier application. They applied DC315 over exposed polyurethane spray foam. Certified thickness, verified WFT, and flawless documentation for our project engineers.”
Angela E.
Mississauga, ON
General ContractorCommercialDC315 Fire Coating
“Certified DC315 applicator. They sprayed our custom home crawl space foam and protected the space with ignition barrier coating. Neat, prompt, and completely compliant with local building codes.”
Gregory M.
Vaughan, ON
BuilderResidentialSpray Foam & Fire Paint
“They did a fantastic job with DC315 intumescent coating over foam in our commercial kitchen expansion. CCMC approved, passed municipal inspection first try. Professional and clean crews.”
Anna L.
Oakville, ON
General ContractorCommercialDC315 Thermal Barrier
“Hired them to apply cementitious fireproofing on the structural steel beams of a new commercial parking garage. Professional spray application of SFRM to code thickness. Passed third-party inspections first try with zero thickness issues.”
Fatima Z.
York, Toronto
General ContractorCommercialCementitious Fireproofing
“Excellent structural steel fireproofing service. They sprayed low-density cementitious material on the metal deck and columns. Crew worked safe at heights, fully WSIB compliant, and completed the job on schedule.”
Vikram M.
Mississauga, ON
BuilderCommercialCementitious Fireproofing
“We hire them for all our mid-rise commercial steel projects. Their crews apply cementitious fire resistive material (SFRM) to exact building code thickness. Prompt service, great prices, and fully insured.”
“Passed our building inspection. They applied cementitious fire protection on steel columns in our new industrial building. Professional prep, excellent density control, and spotless cleanup. Great contractor.”
Tariq H.
Brampton, ON
BuilderCommercialCementitious Fireproofing
“Professional SFRM fireproofing contractor. They sprayed structural steel beams to meet 2-hour rating requirements. They provided complete technical documents and W/D ratio thickness charts for local inspectors.”
Yasmin R.
Markham, ON
General ContractorCommercialCommercial Fireproofing
“Sprayed cementitious fireproofing on steel deck and joists for our school project. Outstanding team, certified fireproofing crews, WSIB insured. They completed the work on schedule, passing inspection easily.”
Sanjay G.
Oakville, ON
BuilderCommercialStructural Steel Fireproofing
“Reliable commercial fireproofing contractor. Applied cementitious spray on structural steel beams in our new retail development. Excellent price, fast application, and zero scheduling delays.”
“We needed medium-density cementitious fireproofing for a semi-exposed commercial parking deck. They applied the Monokote SFRM flawlessly. Passed thickness inspection first try. Outstanding crew.”
Chen W.
Barrie, ON
General ContractorCommercialParking Garage Fireproofing
“Great experience. They sprayed structural steel columns on our new commercial warehouse. The application thickness met all building code requirements. Highly professional, certified crews.”
Mei L.
Whitby, ON
BuilderCommercialCommercial Fireproofing
“Hired them to fireproof steel framing in a commercial office. They applied cementitious spray to exact specification and cleaned up every scrap of overspray. Passed inspections without issues.”
“Highly professional SFRM application. They worked around our other trades to fireproof structural columns on schedule. Clean work, CCMC approved materials, WSIB insured. Will use again.”
Ying H.
London, ON
General ContractorCommercialCementitious Fireproofing
“We hired Sprayfoam Solutions to apply thin-film intumescent fire coating on architecturally exposed structural steel (AESS) beams in our new corporate headquarters lobby. The finish is incredibly smooth and looks like paint, yet provides a certified 2-hour fire rating. Passed third-party DFT testing first try.”
Jun Y.
Downtown Toronto, Toronto
General ContractorCommercialIntumescent Steel Fireproofing
“Outstanding thin-film intumescent application on exposed steel columns in a retail space. The architects wanted the steel visible, so cementitious was out. They did a marvelous job, primer and topcoat were perfectly applied.”
Linh N.
Mississauga, ON
BuilderCommercialIntumescent Fire Protection
“They applied intumescent coating on exposed timber beams in a heritage building restoration. Achieved code fire rating while preserving the historical wooden structure. Excellent workmanship, clean and professional.”
Jin S.
The Annex, Toronto
General ContractorCommercialAESS Fireproofing
“Excellent intumescent application for exposed structural steel in a commercial office. They verified dry film thickness (DFT) meticulously and provided complete documentation for the fire marshal. Passed inspection.”
“Hired them to apply intumescent fireproofing on steel structural columns in a new restaurant. Smooth finish, CAN/ULC-S101 compliant, and completed on schedule. Great contractor and pricing.”
Hao T.
Brampton, ON
BuilderCommercialThin-Film Intumescent
“Professional intumescent coating application on steel framing. Architects specified exposed steel look. This thin-film coating expanded perfectly in fire testing. Certified crews, WSIB insured, $5M liability.”
Raymond C.
Markham, ON
General ContractorCommercialAESS Fire Protection
“We needed a 1-hour fire rating on exposed structural steel columns. They applied thin-film water-based intumescent. Excellent smooth paint-like finish, on schedule, and zero issues with building code inspector.”
Kevin C.
Oakville, ON
Project ManagerCommercialIntumescent Fireproofing
“Great thin-film intumescent coating service. They worked weekends to prevent disrupting our ongoing commercial tenant operations. The finish looks spectacular and meets building code. Highly recommended.”
Raymond K.
Hamilton, ON
BuilderCommercialIntumescent Steel Coating
“They applied intumescent fire paint on exposed structural steel columns in a new school library. Smooth AESS finish, WSIB insured, same-week scheduling. Excellent coordination with our drywallers.”
Brenda C.
Barrie, ON
General ContractorCommercialIntumescent Fire Protection
“Professional thin-film intumescent application on exposed steel rafters. Excellent dry film thickness (DFT) reports provided. Passed building inspections first try. Best fireproofing contractor.”
Samuel G.
Pickering, ON
BuilderCommercialAESS Fireproofing
“They sprayed thin-film intumescent over steel framing in our commercial renovation. Cured quickly and was ready for topcoat in 24 hours. Certified crews, outstanding workmanship and pricing.”
Pamela R.
Kitchener, ON
General ContractorCommercialIntumescent Steel Coating
“Insulated and fireproofed historical timber beams in a heritage loft conversion. Thin-film intumescent kept the wood visible while meeting the 1-hour fire safety code. Outstanding workmanship.”
Benjamin B.
London, ON
BuilderCommercialHeritage Fire Protection
“We had 20,000 sq ft of our logistics warehouse insulated with closed-cell spray foam. The building condensation is completely gone. Their commercial rig handled the project in just three days without interrupting our daily operations.”
Amit P.
Mississauga, ON
Facilities DirectorCommercialWarehouse Insulation
“They insulated a retail commercial building envelope for us. High-performance closed-cell foam acted as both insulation and vapor barrier. Excellent scheduling and pass on code inspection. Highly professional.”
Rajesh S.
Etobicoke, Toronto
General ContractorCommercialCommercial Spray Foam
“Used them for a multi-unit commercial project. They applied closed-cell spray foam on metal stud walls. Passed building code on the first inspection. Clean framing and no overspray. Excellent partner.”
Priya K.
Vaughan, ON
BuilderCommercialOffice Building Insulation
“Critical temperature control was required for our food distribution warehouse. They sprayed closed-cell foam on the ceiling and walls. Amazing condensation control and thermal barrier. Professional commercial crew.”
“We hired them to insulate a large steel commercial building. The closed-cell spray foam bonds perfectly to metal panels, stopping rust and drafts. Excellent WSIB-compliant, licensed crew.”
Fatima Z.
Markham, ON
Project ManagerCommercialMetal Building Insulation
“They sprayed our large farm workshop and barn walls. Condensation was ruining our equipment. Now the barn is draft-free and dry. Great commercial rates and top quality. Highly recommended.”
Vikram M.
Barrie, ON
Project ManagerCommercialAgricultural Spray Foam
“We use their commercial services for all our industrial buildings. Their rigs are top-of-the-line, and their installers are Caliber Certified (CAN/ULC-S705.2 licensed). Passed building inspections first try.”
Rohan D.
Hamilton, ON
BuilderCommercialCommercial Spray Foam
“Insulated a commercial property crawl space to stop drafts rising into offices. Polyurethane closed-cell foam was applied flawlessly. Punctual crew, WSIB insured, $5M liability coverage. Highly recommended.”
Tariq H.
Oakville, ON
Property ManagerCommercialCommercial Crawl Space
“Professional warehouse insulation project. They covered all our stock with plastic sheeting before spraying. Clean, code-compliant, and on-schedule. Our HVAC energy bills dropped by 35%.”
Yasmin R.
Pickering, ON
Facilities DirectorCommercialWarehouse Insulation
“Hired them to fix condensation in an industrial steel warehouse. Closed-cell spray foam solved the problem completely and added structural rigidity to the metal siding. Outstanding service.”
Sanjay G.
Kitchener, ON
General ContractorCommercialMetal Building Insulation
“Insulated four exterior industrial storage tanks using CCMC-approved closed-cell polyurethane foam. The thermal performance is exceptional. Safe mobilization, certified crews, and zero safety issues.”
Anjali V.
London, ON
Facilities DirectorCommercialSilo & Tank Insulation
“We needed custom shipping containers insulated for mobile office use. They sprayed 2 inches of closed-cell foam on the interior walls. No condensation, perfectly flat finish. Passed inspection easily.”
“Hired them to insulate a multi-story apartment building renovation. Spanning five floors, they completed the wall and floor assemblies on schedule. Professional, fully insured, and CCMC certified.”
“Excellent commercial insulation partner. We use them for all our steel-frame developments. Their high-output mobile rigs are fast, and the foam thickness is highly consistent. Excellent rates.”
Wei Z.
Vaughan, ON
General ContractorCommercialCommercial Spray Foam
“They insulated our older commercial warehouse ceiling. Closed-cell spray foam sealed all the deck joints and stopped winter drafts. We noticed a major reduction in gas bills.”
Ying H.
Brampton, ON
Facilities DirectorCommercialWarehouse Retrofit
“Hired Sprayfoam Solutions to restore our warehouse roof using a hybrid flat roof spray foam and silicone roof coating. No tear-off was required, saving us over $40,000 compared to a traditional roof replacement. The roof is 100% waterproof and reflects heat perfectly.”
“Our commercial flat roof was constantly leaking. They applied high-density spray foam and a high-solids silicone coating. It created a seamless, ponding-water resistant membrane. The project was completed on budget with zero downtime for our tenants.”
Linh N.
Mississauga, ON
Property ManagerCommercialFlat Roof Restoration
“Saved our commercial roof without a costly tear-off. They repaired the leaks and applied a reflective silicone coating. Rooftop temperatures dropped significantly, lowering our summer AC costs. Excellent service.”
“Outstanding roof restoration project. They applied 3lb high-density spray foam directly over our old membrane. Sealed every roof penetration perfectly. Excellent certified crew, WSIB insured.”
Min-Ji K.
Brampton, ON
Project ManagerCommercialCommercial Flat Roof
“Professional flat roof restoration. Seamless foam and silicone coating has stopped all leaks and significantly improved the building insulation. Professional, licensed team, and competitive pricing.”
Hao T.
Markham, ON
Property ManagerCommercialFlat Roof Restoration
“Great flat roof coating service. They performed a thermal scan to locate wet insulation, replaced those sections, and coated the roof with reflective silicone. 100% leak-proof and energy efficient.”
“Insulated and waterproofed our industrial plaza flat roof. Seamless high-density foam stops drafts and water leaks in one shot. Certified installers using CCMC-approved roofing systems.”
Kevin C.
Hamilton, ON
Project ManagerCommercialFlat Roof Spray Foam
“Professional, certified crews. They did a marvelous job applying silicone coating on our warehouse flat roof. Complete ponding water resistance and 20-year durability. Excellent work.”
“We have used them for two flat roof restorations now. High-density spray foam followed by white reflective silicone. Tenants reported immediate comfort improvements. No leaks, highly recommended.”
“Restored our retail store flat roof without interrupting business. Seamless spray foam and silicone coating has survived two harsh winters with zero issues. Great warranties and WSIB insured.”
“Excellent roof restoration service. Thermal scan was done first to ensure no wet insulation was covered. The silicone coating application was very clean with no overspray on surrounding cars.”
Stephanie L.
London, ON
Project ManagerCommercialSilicone Roof Coating
“High-density polyurethane foam and reflective coating applied on our manufacturing facility roof. Lowered our cooling costs by 20% last summer. Excellent service, clean, and highly professional.”
Ronald K.
Vaughan, ON
Facilities DirectorCommercialFlat Roof Spray Foam
“We needed a certified 15-minute thermal barrier for a large commercial permit. Their DC315 application was flawlessly done, meeting all Building Code compliance standards on the first inspection. They provided full wet film thickness documentation.”
Rebecca P.
Scarborough, Toronto
General ContractorCommercialDC315 Fire Coating
“Highest rated fireproofing team in the GTA. They arrived within 48 hours for a CAN/ULC-S124 compliant intumescent coating project in a basement suite. The documentation provided was exactly what the inspector needed.”
Anthony G.
Mississauga, ON
General ContractorResidentialSpray Foam & DC315
“We use Sprayfoam Solutions for all our exposed spray foam projects. They apply the closed-cell foam and the DC315 fire coating on the same day—one crew, one mobilization. Saves time and framing stays clean.”
Laura J.
Vaughan, ON
BuilderResidentialDC315 Thermal Barrier
“Highly professional DC315 intumescent coating application on exposed spray foam in our mechanical rooms. The crew verified wet film thickness (WFT) continuously and left a spotless workspace. Passed inspection.”
Albert N.
Brampton, ON
Project ManagerCommercialDC315 Fire Coating
“Ontario Building Code requires a thermal barrier over exposed basement spray foam. Their DC315 application was fast and certified. They provided the CCMC evaluation report immediately for our permit file.”
Cynthia O.
Markham, ON
BuilderResidentialThermal Barrier Code Compliance
“They applied DC315 fire coating over exposed spray foam in an attic storage area. Passed building code inspection first try. Certified applicator, WSIB insured, and same-week scheduling. Excellent.”
Ryan S.
Oakville, ON
General ContractorCommercialDC315 Fire Coating
“We hire them for all our legal duplex conversions. They spray the closed-cell insulation and follow up with DC315 intumescent coating for code-compliant fire safety. Fast, neat, and highly professional.”
Kathleen D.
Hamilton, ON
BuilderResidentialSpray Foam & Fire Coating
“Excellent experience. Certified DC315 application over foam in a commercial mechanical loft. Passed inspection easily. They provided a full documentation package with CCMC evaluation reports.”
Justin F.
Barrie, ON
General ContractorCommercialDC315 Thermal Barrier
“We needed a 15-minute thermal barrier in an unfinished basement remodel. They sprayed the closed-cell foam and followed up with code-compliant DC315 fire coating. Passed building permit inspection.”
Amy W.
Kitchener, ON
BuilderResidentialDuplex Code Compliance
“Certified intumescent fire paint over spray foam. The application was clean with no overspray on steel beams or electrical runs. The crew was professional, polite, and fully WSIB insured.”
Brandon H.
London, ON
General ContractorCommercialDC315 Fire Coating
“Passed our building inspection with flying colors. The DC315 application met the 15-minute thermal barrier requirements under the Ontario building code. Highly professional service and documentation.”
Shirley A.
Oshawa, ON
General ContractorCommercialExposed Foam Fire Code
“Excellent duplex conversion project. They applied closed-cell spray foam and DC315 fire coating in the mechanical room. Outstanding coordination, clean work, and complete code compliance.”
Frank T.
East York, Toronto
BuilderResidentialDC315 Thermal Barrier
“Professional fire barrier application. They applied DC315 over exposed polyurethane spray foam. Certified thickness, verified WFT, and flawless documentation for our project engineers.”
Angela E.
Mississauga, ON
General ContractorCommercialDC315 Fire Coating
“Certified DC315 applicator. They sprayed our custom home crawl space foam and protected the space with ignition barrier coating. Neat, prompt, and completely compliant with local building codes.”
Gregory M.
Vaughan, ON
BuilderResidentialSpray Foam & Fire Paint
“They did a fantastic job with DC315 intumescent coating over foam in our commercial kitchen expansion. CCMC approved, passed municipal inspection first try. Professional and clean crews.”
Anna L.
Oakville, ON
General ContractorCommercialDC315 Thermal Barrier
“Hired them to apply cementitious fireproofing on the structural steel beams of a new commercial parking garage. Professional spray application of SFRM to code thickness. Passed third-party inspections first try with zero thickness issues.”
Fatima Z.
York, Toronto
General ContractorCommercialCementitious Fireproofing
“Excellent structural steel fireproofing service. They sprayed low-density cementitious material on the metal deck and columns. Crew worked safe at heights, fully WSIB compliant, and completed the job on schedule.”
Vikram M.
Mississauga, ON
BuilderCommercialCementitious Fireproofing
“We hire them for all our mid-rise commercial steel projects. Their crews apply cementitious fire resistive material (SFRM) to exact building code thickness. Prompt service, great prices, and fully insured.”
“Passed our building inspection. They applied cementitious fire protection on steel columns in our new industrial building. Professional prep, excellent density control, and spotless cleanup. Great contractor.”
Tariq H.
Brampton, ON
BuilderCommercialCementitious Fireproofing
“Professional SFRM fireproofing contractor. They sprayed structural steel beams to meet 2-hour rating requirements. They provided complete technical documents and W/D ratio thickness charts for local inspectors.”
Yasmin R.
Markham, ON
General ContractorCommercialCommercial Fireproofing
“Sprayed cementitious fireproofing on steel deck and joists for our school project. Outstanding team, certified fireproofing crews, WSIB insured. They completed the work on schedule, passing inspection easily.”
Sanjay G.
Oakville, ON
BuilderCommercialStructural Steel Fireproofing
“Reliable commercial fireproofing contractor. Applied cementitious spray on structural steel beams in our new retail development. Excellent price, fast application, and zero scheduling delays.”
“We needed medium-density cementitious fireproofing for a semi-exposed commercial parking deck. They applied the Monokote SFRM flawlessly. Passed thickness inspection first try. Outstanding crew.”
Chen W.
Barrie, ON
General ContractorCommercialParking Garage Fireproofing
“Great experience. They sprayed structural steel columns on our new commercial warehouse. The application thickness met all building code requirements. Highly professional, certified crews.”
Mei L.
Whitby, ON
BuilderCommercialCommercial Fireproofing
“Hired them to fireproof steel framing in a commercial office. They applied cementitious spray to exact specification and cleaned up every scrap of overspray. Passed inspections without issues.”
“Highly professional SFRM application. They worked around our other trades to fireproof structural columns on schedule. Clean work, CCMC approved materials, WSIB insured. Will use again.”
Ying H.
London, ON
General ContractorCommercialCementitious Fireproofing
“We hired Sprayfoam Solutions to apply thin-film intumescent fire coating on architecturally exposed structural steel (AESS) beams in our new corporate headquarters lobby. The finish is incredibly smooth and looks like paint, yet provides a certified 2-hour fire rating. Passed third-party DFT testing first try.”
Jun Y.
Downtown Toronto, Toronto
General ContractorCommercialIntumescent Steel Fireproofing
“Outstanding thin-film intumescent application on exposed steel columns in a retail space. The architects wanted the steel visible, so cementitious was out. They did a marvelous job, primer and topcoat were perfectly applied.”
Linh N.
Mississauga, ON
BuilderCommercialIntumescent Fire Protection
“They applied intumescent coating on exposed timber beams in a heritage building restoration. Achieved code fire rating while preserving the historical wooden structure. Excellent workmanship, clean and professional.”
Jin S.
The Annex, Toronto
General ContractorCommercialAESS Fireproofing
“Excellent intumescent application for exposed structural steel in a commercial office. They verified dry film thickness (DFT) meticulously and provided complete documentation for the fire marshal. Passed inspection.”
“Hired them to apply intumescent fireproofing on steel structural columns in a new restaurant. Smooth finish, CAN/ULC-S101 compliant, and completed on schedule. Great contractor and pricing.”
Hao T.
Brampton, ON
BuilderCommercialThin-Film Intumescent
“Professional intumescent coating application on steel framing. Architects specified exposed steel look. This thin-film coating expanded perfectly in fire testing. Certified crews, WSIB insured, $5M liability.”
Raymond C.
Markham, ON
General ContractorCommercialAESS Fire Protection
“We needed a 1-hour fire rating on exposed structural steel columns. They applied thin-film water-based intumescent. Excellent smooth paint-like finish, on schedule, and zero issues with building code inspector.”
Kevin C.
Oakville, ON
Project ManagerCommercialIntumescent Fireproofing
“Great thin-film intumescent coating service. They worked weekends to prevent disrupting our ongoing commercial tenant operations. The finish looks spectacular and meets building code. Highly recommended.”
Raymond K.
Hamilton, ON
BuilderCommercialIntumescent Steel Coating
“They applied intumescent fire paint on exposed structural steel columns in a new school library. Smooth AESS finish, WSIB insured, same-week scheduling. Excellent coordination with our drywallers.”
Brenda C.
Barrie, ON
General ContractorCommercialIntumescent Fire Protection
“Professional thin-film intumescent application on exposed steel rafters. Excellent dry film thickness (DFT) reports provided. Passed building inspections first try. Best fireproofing contractor.”
Samuel G.
Pickering, ON
BuilderCommercialAESS Fireproofing
“They sprayed thin-film intumescent over steel framing in our commercial renovation. Cured quickly and was ready for topcoat in 24 hours. Certified crews, outstanding workmanship and pricing.”
Pamela R.
Kitchener, ON
General ContractorCommercialIntumescent Steel Coating
“Insulated and fireproofed historical timber beams in a heritage loft conversion. Thin-film intumescent kept the wood visible while meeting the 1-hour fire safety code. Outstanding workmanship.”
Direct contractor pricing · CAN/ULC-S101 & S124 Certified · $0 Travel Fee Across Ontario
50+ Cities & Municipalities
With regional mobile crews stationed right near you, we charge $0 travel fees and stand as the best, most trusted contractor to serve your home or commercial building anywhere in Ontario.