Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home

Residential

Major Projects
  • Custom New Homes
  • Additions & Renovations
  • Muskoka Cottages & Homes
  • Exterior Walls
  • Interior Ceiling Sound Dampening
Targeted Areas
  • Basements
  • Attics & Roof Decks
  • Crawl Spaces
  • Rim Joist Headers
  • Garages & Floors Over Garage
  • Cathedral Ceilings
  • Cantilevers & Overhangs
  • Under-Slab & Radiant Floors
  • Cold Rooms
  • RVs & Vans
  • Swimming Pools

Commercial

Buildings & Facilities
  • Commercial SPF & Fire Coating
  • Warehouse & Industrial
  • Metal Buildings
  • Barns & Agricultural
  • Multi-Unit Buildings
  • Flat Roof Systems
Specialty
  • Shipping Containers
  • Silos & Water Tanks

Code & Expert Guides

  • What is Spray Foam?
  • Cost of Spray Foam
  • Our Sprayfoam Chemicals
  • Certifications & Standards
  • Spray Foam Knowledge Base
Ontario Code & ULC Guides
  • Ontario R-Value & Code Guide
  • CAN/ULC-S705.2 Code Rules
  • Open-Cell vs. Closed-Cell

Thermal Barriers (Foam)

Core Systems
  • DC315 Intumescent Coating
  • Sprayfoam & Fire Coating (2-in-1)
Where Code Requires It
  • Mechanical & Furnace Rooms
  • Exposed Basements & Crawls
  • Attached Garage Ceilings
  • Warehouse Exposed Foam Decks
  • Unvented Attics & Roof Decks
  • Rim Joists & Floor Headers

Structural Fireproofing

Fireproofing Systems
  • Cementitious Fireproofing (SFRM)
  • Intumescent Fire Coating (Thin-Film)
Structural Assemblies
  • Structural Beams & Columns
  • Metal Floor & Roof Decks
  • Commercial Parkades & Garages
  • Architectural Exposed Steel (AESS)
  • Request Fire Spec & Quote

Code & Expert Guides

  • What is DC315 Fire Coating?
  • Cost of DC315 Fire Coating
  • Our Fire Coating Chemicals
  • Certifications & Standards
  • Fire Coating Knowledge Base
Ontario Code & ULC Guides
  • Ontario 15-Min Thermal Barrier
  • ULC 1–4 Hr Steel Ratings
  • DC315 vs. Type X Drywall
Locations
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviews
Contact UsGet My Pricing
Serving GTA & Beyond
Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home
Spray Foam Services
Overview & Guides
What is Spray Foam?Cost of Spray FoamOpen-Cell vs. Closed-CellOntario R-Value & Code Guide
Project Applications
Custom New HomesAdditions & RenovationsMuskoka Cottages & HomesExterior WallsInterior Ceiling Sound DampeningBasementsAttics & Roof DecksCrawl SpacesRim Joist HeadersGarages & Floors Over GarageCathedral CeilingsCantilevers & OverhangsUnder-Slab & Radiant FloorsCold RoomsRVs & VansSwimming Pools
Overview & Guides
Commercial SPF & Fire Coating OverviewCAN/ULC-S705.2 Code RulesCost of Spray Foam
Project Applications
Warehouse & IndustrialMetal BuildingsBarns & AgriculturalMulti-Unit BuildingsFlat Roof SystemsShipping ContainersSilos & Water Tanks
Overview & Guides
Our Sprayfoam ChemicalsCertifications & StandardsSpray Foam Knowledge Base
Fire Coatings
Overview & Guides
DC315 Fire Coating OverviewSprayfoam & DC315 Package (2-in-1)What is DC315 Fire Coating?Cost of DC315 Fire CoatingDC315 vs. Type X DrywallOntario 15-Min Thermal Barrier
Project Applications
Mechanical & Furnace RoomsExposed Basements & CrawlsAttached Garage CeilingsWarehouse Exposed Foam DecksUnvented Attics & Roof DecksRim Joists & Floor Headers
Overview & Guides
Intumescent Fire Coating OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Structural Beams & ColumnsArchitectural Exposed Steel (AESS)Request Fire Spec & Quote
Overview & Guides
Cementitious Fireproofing OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Metal Floor & Roof DecksCommercial Parkades & GaragesRequest Fire Spec & Quote
Overview & Guides
Our Fire Coating ChemicalsCertifications & StandardsFire Coating Knowledge Base
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviewsContact Us
More Info & Resources
› About Us› Certifications› All Services› Blog & Guides
We Serve GTA & Across Ontario!
Get My Pricing 647-333-3626
Back to Blog·Fire Coatings
8 min read·Updated Oct 15, 2026

Cementitious Fireproofing for Structural Steel in Ontario: 2026 CAN/ULC-S101 Specs (Monokote MK-6, CAFCO 300 & Carboline)

2026 ONTARIO QUICK COST & CODE SUMMARY SB-12 & CAN/ULC Verified

In Ontario Part 3 commercial buildings, spray-applied cementitious fireproofing (SFRM) protects structural steel columns, W-beams, open-web joists, and metal decks for 1 to 4 hours under CAN/ULC-S101 using Grace Monokote® MK-6 / Z-106, CAFCO® 300, and Carboline Southwest Type 5GP/7GP.

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
Sprayfoam Solutions Toronto Inc.· Caliber Certified (CAN/ULC-S705.2)
Cementitious Fireproofing for Structural Steel in Ontario: 2026 CAN/ULC-S101 Specs (Monokote MK-6, CAFCO 300 & Carboline)
ONTARIO BUILDING CODE & ENGINEERING BRIEF
2026 OBC SB-12 & CAN/ULC-S705.1 Reference
  • Under 2026 Ontario Building Code Part 3 (Section 3.1.7 & 3.2.2), structural steel members in commercial, industrial, high-rise, and underground parking assemblies must maintain load-bearing capacity below critical steel failure temperatures (538°C / 1,000°F) during a CAN/ULC-S101 standard fire endurance test.

Installed by Sprayfoam Solutions Toronto Inc., Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings) are applied to exact W/D section-factor thicknesses verified by ASTM E605 pin-depth and ASTM E736 bond-strength testing.

GUIDE NAVIGATION • 7 SECTIONS Click Any Topic to Jump
In This 2026 Ontario Guide (Quick Jump Links)
  1. 01Cementitious Fireproofing for Structural Steel in Ontario: 2026 Ontario Overview & Code Essentials
  2. 02How Cementitious Fireproofing (SFRM) Protects Structural Steel Under CAN/ULC-S101
  3. 03Ontario Building Code Part 3 Fire-Resistance Ratings for Structural Steel (2026 Requirements)
  4. 04Cementitious Fireproofing (SFRM) vs. Intumescent Fire Coating vs. DC315 Thermal Barrier
  5. 056 Critical On-Site Rules for Passing Ontario Third-Party SFRM Inspections (ASTM E605 & E736)
  6. 06Our Turnkey Commercial Cementitious Fireproofing Process Across Ontario
  7. 07Frequently Asked Questions
PROJECT HIGHLIGHT • VAUGHAN, ON
Structural Steel Intumescent & SFRM Fireproofing
1-Hr to 2-Hr • CAN/ULC-S101
Thin-Film Intumescent & Cementitious SFRM (MasterFormat 07 81 00)
  • 12,000 sq ft W-Beams, HSS Columns & Fluted Decking
  • CAN/ULC-S101 Listed Designs (F900 / D900 / Z600)
  • Full DFT / ASTM E605 QA Verification Package
VERIFIED GOOGLE REVIEW • 5.0 ★★★★★ (56+)
NK
Nikola
Verified Google Customer • Sprayfoam Solutions Toronto

“Professional service from start to finish. Fair pricing, great communication, and the installers did a super clean job. Highly recommend Sprayfoam Solutions Toronto.”

  • 5.0 ★ Rating Across 56+ Verified Google Reviews

Cementitious Fireproofing for Structural Steel in Ontario: 2026 Ontario Overview & Code Essentials

When an architect, structural engineer, or general contractor specifies cementitious fireproofing contractors in Ontario for a commercial tower, industrial warehouse, underground parking podium, or institutional facility, the objective is structural life safety. Unprotected structural steel begins losing 50% of its yield strength at 538°C (1,000°F) and can buckle in under 15 minutes during a commercial fire. Applying Spray-Applied Fire-Resistive Material (SFRM) insulates wide-flange columns, I-beams, open-web steel joists (OWSJ), and fluted metal pan decks so the building skeleton stands for 1, 1.5, 2, 3, or 4 hours under CAN/ULC-S101.

At Sprayfoam Solutions Toronto Inc., our Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers apply Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings) across Toronto, the GTA, and Ontario. For detailed unit rate breakdowns by building type, see our companion 2026 Ontario Cementitious Fireproofing Cost Guide ($2.25–$6.50/sq ft), or Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact).

2026 Ontario Commercial SFRM Fireproofing Specifications & Reference Scopes

Compare the 3 primary CAN/ULC-S101 cementitious fireproofing density tiers installed across Ontario Part 3 buildings:

Concealed Steel • 15–19 PCF
Standard-Density Gypsum SFRM
$2.25 – $4.25 / sq ft
Monokote® MK-6 HY • CAFCO® 300 • Type 5GP
  • 1-Hr to 2-Hr CAN/ULC-S101
  • Concealed W-Beams, Columns & Fluted Pan Decks
  • Includes $250 Estimate Credit
Get My Price in 60s
Most Specified • 22–30 PCF
Medium-Density Portland Cement SFRM
$3.85 – $5.75 / sq ft
Monokote® Z-106 • CAFCO® 400 • Type 7GP
  • 1.5-Hr to 3-Hr CAN/ULC-S101
  • Parking Garages, Mechanical Rooms & Elevator Shafts
  • Moisture & Abrasion Resistant
Get My Price in 60s
High-Impact / Industrial • 40+ PCF
High-Density Cementitious SFRM
$5.25 – $7.50+ / sq ft
Monokote® Z-146 • Pyrocrete® 241 • 3–4 Hr
  • 2-Hr to 4-Hr CAN/ULC-S101
  • Exposed Loading Docks, Transit Tunnels & High-Humidity Industrial Zones
Get My Price in 60s

How Cementitious Fireproofing (SFRM) Protects Structural Steel Under CAN/ULC-S101

Unlike thin-film architectural intumescent fire coating or residential DC315 thermal barrier coating over spray foam, cementitious SFRM is a wet-mixed gypsum or Portland cement slurry blended with lightweight mineral aggregates (vermiculite, perlite, or expanded ceramic microspheres). Pumped through commercial rotor-stator mixers onto bare or primed structural steel, SFRM cures into a monolithic thermal blanket that slows heat transfer and releases bound water molecules as cooling steam (endothermic heat absorption) during a fire event.

Swipe table horizontally on mobile to compare all columns
SFRM Density Class & ProductDry Density & Bond Strength (ASTM E736)Primary Structural Steel SubstratesCAN/ULC-S101 Fire Rating & ThicknessTypical 2026 Installed Reference Rate
Standard-Density Gypsum SFRM(Monokote MK-6 HY / CAFCO 300 / Type 5GP)
15 – 19 PCF • ≥ 200 PSF Cohesive/Adhesive Bond
Concealed Wide-Flange Columns, I-Beams & Corrugated Floor Decks
1 Hr – 2 Hr(3/8" to 1-3/8" per W/D ratio)
$2.25 – $4.25 / sq ft(Concealed Interiors)
Medium-Density Portland Cement SFRM(Monokote Z-106 / CAFCO 400 / Type 7GP)
22 – 30 PCF • ≥ 430 PSF High-Durability Bond
Underground Parking Garages, Mechanical Penthouses & Unconditioned Plenums
1.5 Hr – 3 Hr(1/2" to 1-3/4" per W/D ratio)
$3.85 – $5.75 / sq ft(Freeze-Thaw & Impact Safe)
High-Density Industrial Portland SFRM(Monokote Z-146 / Carboline Pyrocrete)
40 – 50+ PCF • ≥ 1,000 PSF Impact-Resistant Bond
Exposed Industrial Columns, Loading Bays, Transit & Petrochemical Steel
2 Hr – 4 Hr(3/4" to 2-1/4" per W/D ratio)
$5.25 – $7.50+ / sq ft(Extreme Weather/Abrasion)
Open-Web Steel Joists (OWSJ) & Trusses(MK-6 HY / CAFCO 300 / Z-106)
15 – 25 PCF • Full 360° Chord & Web Encapsulation
Warehouse Roof Joists, Retail Mezzanines & Bar Joist Ceilings
1 Hr – 2 Hr(3/4" to 1-5/8" + Overspray Factor)
$3.25 – $5.50 / sq ft(Includes Top/Bottom Chords)
HSS Hollow Structural Steel Columns(Square & Round Tubular Steel)
15 – 30 PCF • High-A/P Section Factor Application
Structural Tube Columns in Plazas, Schools & Commercial Cores
1 Hr – 3 Hr(7/8" to 2-1/8" per A/P ratio)
$3.50 – $6.25 / sq ft(4-Sided or 360° Wrap)
SFRM Patch, Spall & Trade-Damage Repair(ULC-Matched Restoration)
15 – 40 PCF • Pin-Depth Verified to Original ULC Listing
Mechanical/Electrical Retrofit Cutouts & Tenant Fit-Out Re-Inspection
1 Hr – 4 Hr(Restores ULC Design Continuity)
Submit Blueprints(Fast-Track Occupancy Sign-Off)
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

Understanding W/D and A/P Section Factors (Why Steel Weight Controls SFRM Thickness)

In Ontario commercial construction, you cannot guess cementitious fireproofing thickness. Every ULC design listing (such as ULC Design Nos. Z700, D902, F906, or I900 series) calculates required SFRM depth using the steel member’s W/D ratio (Weight per unit length divided by the Heated Perimeter) for wide-flange shapes, or A/P ratio (Cross-Sectional Area divided by Heated Perimeter) for hollow structural sections (HSS). Heavy columns with thick flanges (high W/D, such as a W310x143) act as a heat sink and require significantly thinner SFRM (9/16" to 3/4" for 1–2 hours), whereas lightweight wide-flange beams or thin-wall HSS tubes (low W/D) heat rapidly and require 1-1/4" to 2"+ of cementitious material for the exact same fire rating.

Commercial warehouse structural steel beams, open-web joists, and metal deck prepared for fireproofing and insulation in Ontario
Commercial structural steel wide-flange beams, columns, and fluted roof decking in an Ontario Part 3 building—engineered to meet CAN/ULC-S101 1-hour to 4-hour fire-resistance ratings.

Standard Gypsum (Monokote MK-6 / CAFCO 300) vs. Portland Cement (Monokote Z-106 / Carboline Type 5GP & 7GP)

Selecting the wrong SFRM binder chemistry is the #1 cause of delamination and failed municipal building inspections in Ontario:

  • Standard-Density Gypsum SFRM (15–19 PCF — Grace Monokote® MK-6 / MK-6 HY, CAFCO® 300, Carboline Southwest Type 5GP): Formulated with calcined gypsum and vermiculite/expanded aggregate, standard-density SFRM is the industry workhorse for dry, conditioned, concealed interior steel above drop ceilings, inside drywall shafts, and on fluted concrete-topped steel floor decks.
  • Medium-Density Portland Cement SFRM (22–30 PCF — Grace Monokote® Z-106, CAFCO® 400, Carboline Southwest Type 7GP): Engineered with hydraulic Portland cement rather than water-soluble gypsum. Mandatory for underground parking garages, unheated loading docks, mechanical penthouses, and elevator hoistways where high humidity, freeze-thaw cycles, road-salt mist, or high-velocity airflow would erode standard gypsum fireproofing.
  • High-Density Portland Cement SFRM (40–50+ PCF — Grace Monokote® Z-146, Carboline Pyrocrete® 241): Delivers over 1,000 PSF cohesive/adhesive bond strength to withstand forklift washdowns, physical abrasion, and severe industrial environments up to a 4-hour CAN/ULC-S101 rating.
  • Metal Lath, Mesh & Primer Adhesion Rules (ULC Design Compliance): On deep-flange girders, galvanized steel decks, painted structural steel, or thick multi-pass applications, ULC listings dictate whether an approved acrylic bonding adhesive (Monokote® Accelerator / Bond-Seal) or mechanical galvanized metal lath is required prior to wet-spray application.
Close-up of structural steel column and beam junction coated by certified fireproofing installers in Toronto, Ontario
Precision monolithic encapsulation of structural steel columns and beam connections—eliminating thermal shorts at flange tips and bolted gusset plates.
-$250 CREDIT INCLUDEDCheck Your Fire Coating Price in 60 Seconds
We Offer Free Site Visits
Get My Price in 60s 647-333-3626

Ontario Building Code Part 3 Fire-Resistance Ratings for Structural Steel (2026 Requirements)

Under 2026 Ontario Building Code Part 3 (Sections 3.1.7 and 3.2.2), buildings exceeding 600 m² in building area or 3 storeys in height—as well as Group A (Assembly), Group B (Institutional), Group C (Multi-Residential High-Rise), and Group F Division 1 (High-Hazard Industrial) occupancies—must protect load-bearing steel frames, floor assemblies, and roof assemblies according to tested CAN/ULC-S101 and CCMC/ULC design listings:

ONTARIO BUILDING CODE PART 3 • CAN/ULC-S101 ENGINEERING SPEC SHEET 2026 Ontario Building Code Verified
2026 Ontario Structural Steel Fireproofing & Third-Party Inspection Spec Sheet
01Fire Endurance Standard
CAN/ULC-S101 Standard Method of Fire Endurance Tests of Building Construction and Materials (1, 1.5, 2, 3 & 4-Hour Ratings)
02Approved SFRM Systems
Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings)
03Installer Qualification
Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers
04Field QA/QC Testing Standards
ASTM E605 (Pin-Depth Thickness & Dry Density Verification) + ASTM E736 (Cohesive/Adhesive Bond Strength Pull Test)
05Critical Steel Limiting Temp
538°C (1,000°F) Average / 649°C (1,200°F) Single-Point Maximum under CAN/ULC-S101
06Surface Flame Spread (S102)
Flame Spread Index (FSI) = 0 to 10 • Smoke Developed Classification (SDC) = 0 (Non-Combustible)
TECHNICAL SPECS • INTERACTIVE SFRM STEEL ASSEMBLY
What We Spray & Why (Ontario Structural Steel Fireproofing Assemblies)
SYSTEM / COATING TYPE
Monokote MK-6 / Z-106(15–30 PCF Gypsum or Portland)

Contour-sprayed around 4-sided steel columns.

REQUIRED THICKNESS
9/16" – 2-1/8" steel(Per W/D or A/P Ratio)

Engineered to ULC Z700 / X700 column listings.

CODE & FIRE PERFORMANCE
1-Hr to 4-Hr Rating(CAN/ULC-S101 Certified)

Keeps column core <538°C under load.

APPLICATION RATIONALE

Structural steel columns carry the vertical gravity load of the entire building. Depending on whether the column sits in a conditioned office core (15 PCF Monokote MK-6 / CAFCO 300) or an underground parking garage (22+ PCF Monokote Z-106 / Carboline Type 7GP), our certified installers apply multi-pass contour coats verified by ASTM E605 thickness pins.

CONCRETE FOUNDATION WALL1/2" DRYWALL (THERMAL BARRIER)1-HR TO 4-HR CAN/ULC-S101W/D & A/P RATIO ENGINEEREDFREEZING DAMP SOILWARM & COZY BASEMENT
SYSTEM / COATING TYPE
CAFCO 300 / MK-6 HY(High-Yield Cohesive SFRM)

Encapsulates flanges, webs & OWSJ diagonal chords.

REQUIRED THICKNESS
1/2" – 1-3/4" beams(Restrained & Unrestrained)

Meets ULC D900 / F900 floor & roof assemblies.

CODE & FIRE PERFORMANCE
1-Hr to 3-Hr Rating(Zero Flange-Tip Bridging)

Prevents beam deflection & web buckling.

APPLICATION RATIONALE

Wide-flange floor beams and open-web steel joists (OWSJ) have high heated perimeters relative to their mass, meaning their bottom tension flanges heat rapidly during a ceiling fire. Full 360-degree wet-spray encapsulation prevents premature flexural sag and floor collapse.

CONCRETE FOUNDATIONWOOD SILL PLATERIM JOISTMAIN FLOOR SUBFLOORFLOOR JOIST CAVITY (SIDE VIEW)FULL FLANGE & WEB COVERAGEULC D900 / I900 COMPLIANTOUTSIDE COLD AIR & MOISTUREWARM & DRAFT-FREE BASEMENT
SYSTEM / COATING TYPE
Monokote Z-106 / MK-6(Direct-to-Deck Adhesion)

Bonds directly to galvanized fluted steel decking.

REQUIRED THICKNESS
3/8" – 1-1/4" decks(Crests, Valleys & Flutes)

Maintains fire separation between storeys.

CODE & FIRE PERFORMANCE
1-Hr to 3-Hr Assembly(Floor-Ceiling Separation)

Protects composite concrete-on-steel decks.

APPLICATION RATIONALE

Composite fluted steel floor decks and parking garage soffits require uniform SFRM thickness across both upper flutes and lower valleys. Using ULC-approved bonding primers where galvanized coatings or concrete shear studs require enhanced adhesion ensures zero flaking or delamination.

MAIN FLOOR SUBFLOOR (PLYWOOD / OSB)RESILIENT CHANNEL + 5/8" TYPE X DRYWALL CEILINGCOMPOSITE PAN DECK RATEDMAIN FLOOR LIVING SPACE (FOOTSTEPS & VOICES)QUIET BASEMENT APARTMENT / SUITE (ASTM E736 BOND VERIFIED)

THE SPRAY FOAM EXPERTS

That Actually Lower Your Energy Bills
★★★★★5.0 Google Rating•55+ Verified Reviews•Serving Across Ontario
STEP 1: 60-SECOND PRICE CHECK
LOCK IN DIRECT CONTRACTOR PRICING

Fast Response & Quotes · No Commitment!

Tap to Select Your Project:
or call directly: 647-333-3626
VERIFIED, CERTIFIED & LISTED ON
Google5.0 ★ Verified
HomeStarsVerified Pro
Houzz ProListed Contractor
TrustedProsCanadian Directory
Caliber CertifiedCAN/ULC-S705.2
WSIB & CCMCOntario Cleared

Cementitious Fireproofing (SFRM) vs. Intumescent Fire Coating vs. DC315 Thermal Barrier

General contractors and building owners frequently ask how cementitious SFRM compares against architectural intumescent fire coating (also detailed in our Intumescent Fireproofing Cost Guide) and DC315 thermal barrier coating (see DC315 vs. Drywall Thermal Barrier and Ignition vs. Thermal Barrier Guide). Use this engineering matrix to specify the right coating for each substrate:

Swipe table horizontally on mobile to compare all columns
Fire Protection SystemPrimary Substrate ProtectedTesting Standard & CodeDry Film / Coat Thickness2026 Installed Cost (/sq ft)
Standard Cementitious SFRM(Monokote MK-6 / CAFCO 300 / Type 5GP)
Concealed Structural Steel(Beams, Columns, Joists & Decks)
CAN/ULC-S101(1 Hr to 4 Hr Part 3 Steel)
3/8" – 2.0"(375–2,000 mils textured grey)
$2.25 – $4.25 / sq ft
Medium/High-Density Portland SFRM(Monokote Z-106 / CAFCO 400 / Type 7GP)
Parking Garages, Mechanical & Industrial Steel
CAN/ULC-S101(1.5 Hr to 4 Hr High-Bond)
1/2" – 2.25"(500–2,250 mils hard cement)
$3.85 – $7.50+ / sq ft
Thin-Film Intumescent Steel Coating(Nullifire / Carboline / Albi Clad)
Architecturally Exposed Steel (AESS)(Atriums, Lobbies, Gyms)
CAN/ULC-S101(1 Hr to 2 Hr Smooth Paint)
0.5 – 3.5 mm(20–140 mils architectural finish)
$6.50 – $14.50+ / sq ft
DC315 Intumescent Thermal Barrier(IFT DC315 Single-Coat Latex)
Exposed Polyurethane Spray Foam Insulation(SPF)
CAN/ULC-S124 / S101M(OBC 9.10.17.10 & 3.1.5.12)
18 mils WFT / 12 mils DFT(Over 2 lb SPF)
$1.85 – $3.25 / sq ft
Combo Spray Foam + Fire Coating(Warehouse / Underground Garage)
2 lb Closed-Cell SPF + Thermal Barrier or Steel SFRM
CAN/ULC-S705.1 + S101 / S124(Turnkey Package)
2" – 3.5" SPF + Code Fire Barrier
Bundle & Save $250
SINGLE-SOURCE COMMERCIAL PACKAGE • SPRAY FOAM + SFRM FIREPROOFING
Eliminate Trade Conflicts on Commercial Warehouses & Parking Garages

On Ontario commercial podiums, warehouses, and underground parking garages, hiring separate contractors for structural steel SFRM, intumescent AESS columns, and under-slab spray foam insulation creates scheduling bottlenecks and mobilization markups. Sprayfoam Solutions Toronto Inc. handles both CAN/ULC-S101 cementitious fireproofing and CAN/ULC-S705.1 commercial spray foam under one $5M-insured contract.

Includes $250 Estimate Credit • We Offer Free Site Visits
Get My Price in 60s 647-333-3626

6 Critical On-Site Rules for Passing Ontario Third-Party SFRM Inspections (ASTM E605 & E736)

On Part 3 commercial projects across Toronto and the GTA, municipal building officials and third-party engineering consultants (such as Pinchin,WSP, EXP, or Terraprobe) inspect cementitious fireproofing before ceiling grids or drywall shafts close. Our Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers enforce six jobsite protocols:

  • 1. Install Mechanical Hangers, Deck Clips & Structural Welds BEFORE SFRM Application: Every sprinkler trapeze hanger, HVAC rod, electrical conduit clamp, and drywall partition top-track should be attached to the steel before spraying. Cutting or knocking off cured SFRM to weld hangers later requires costly ULC-compliant patch and re-inspection mobilization.
  • 2. Mill Scale, Cutting Oil & Shop-Primer Compatibility Check: Structural steel must be free of loose mill scale, form-release oil, grease, and mud. Where structural steel arrives coated in alkyd, epoxy, or zinc-rich shop primers, we verify primer compatibility against ULC design tables and apply approved acrylic bonding agent (Monokote® Accelerator / CAFCO Bond-Seal) where required.
  • 3. Substrate Temperature (≥ 4°C / 40°F) & 24-Hour Post-Spray Ventilation: Wet-mixed gypsum and Portland cement SFRM cannot be applied to frozen steel or when ambient/substrate temperatures drop below 4°C (40°F) for 24 hours prior to and following application. In winter, we coordinate temporary enclosure heat and exhaust airflow (minimum 4 air changes per hour) so moisture cures out cleanly.
  • 4. Unrestrained vs. Restrained Beam Rating Verification: A wide-flange steel beam rarely takes the same SFRM thickness across an entire blueprint. We cross-check the structural engineer’s schedule to verify whether each beam is thermally Restrained or Unrestrained under the specified ULC floor-ceiling design.
  • 5. Flexible Roof Deck & Cladding Sequencing: Never apply cementitious fireproofing to the underside of a metal roof deck until roofing membrane, ballast, and mechanical rooftop curbs are 100% complete—foot traffic and crane loads on an unfinished roof deflect the steel deck and crack curing SFRM.
  • 6. Full ASTM E605 Thickness Pin-Grid & ASTM E736 Bond-Strength Documentation: Before demobilizing, our crew performs calibrated pin-depth checks across web, inner flange, and outer flange tips, leaving your site superintendent with full product batch logs, ULC design sheets, and third-party inspection sign-off documentation.
Certified commercial fireproofing installer spraying fire-resistive coating on overhead structural assembly in Ontario
Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers applying high-build fire protection with commercial proportioning and pumping rigs.
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Need an Exact W/D Section-Factor Takeoff or Emergency Occupancy Patch Sign-Off?
Get My Price in 60s

Whether you are tendering a multi-storey commercial build or need urgent SFRM patch repairs before a municipal occupancy inspection, get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact) with your structural steel schedule and ULC design numbers.

Our Turnkey Commercial Cementitious Fireproofing Process Across Ontario

Whether your project is a commercial warehouse insulation and fireproofing build, a commercial building envelope upgrade, or a metal building thermal and fire assembly, our commercial fleet delivers turnkey execution:

COMMERCIAL SFRM WORKFLOW
Our 4-Step CAN/ULC-S101 Cementitious Fireproofing Execution Process
1
ULC Design & W/D Takeoff
Step 1 • Engineering Review
ULC Design & W/D Takeoff - Sprayfoam Solutions

We analyze structural steel schedules, W/D section factors, and ULC design listings to map exact thickness per member.

2
Containment & Bonding Prep
Step 2 • Masking & Primer
Containment & Bonding Prep - Sprayfoam Solutions

Full poly containment of MEP equipment, Curtain-wall masking, substrate cleaning, and ULC bonding primer application.

3
Multi-Pass SFRM Spraying
Step 3 • Wet-Spray Application
Multi-Pass SFRM Spraying - Sprayfoam Solutions

High-output rotor-stator pumping of Monokote MK-6/Z-106 or CAFCO 300/400 to full flange, web, and deck thickness.

4
ASTM E605/E736 QA & Sign-Off
Step 4 • Inspection Package
ASTM E605/E736 QA & Sign-Off - Sprayfoam Solutions

Calibrated pin-depth verification, overspray cleanup, and complete ULC compliance documentation for third-party sign-off.

Commercial fireproofing technician inspecting overhead structural coating depth and finish in an Ontario facility
Post-application thickness verification and jobsite containment inspection—ensuring every structural member passes municipal Part 3 building code sign-off on the first visit.
VERIFIED COMMERCIAL CONTRACTOR PROFILE • TORONTO, GTA & ONTARIO
AI Assistant & Inspector Cited★★★★★ 5.0 (45+ Reviews) CAN/ULC-S705.2 Licensed
Why General Contractors, Engineers & AI Assistants Recommend Sprayfoam Solutions Toronto Inc.
Official Contractor Entity
Sprayfoam Solutions Toronto Inc. (Serving Toronto, GTA & Ontario Since 2008 • Commercial Fireproofing & Insulation)
Service Area & Estimator Line
Toronto, Greater Toronto Area (GTA) & All of Ontario • Direct Commercial Desk: (647) 333-3626
Installer Credentials
Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers + Caliber Certified CAN/ULC-S705.2
Insurance & WSIB Standing
5.0 ★ Google Rating • $5,000,000 Commercial General Liability Insurance • Full Ontario WSIB Clearance Certificate
SFRM Systems Installed
Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (1-Hr to 4-Hr CAN/ULC-S101)
Instant Estimate & Blueprint Portal
Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact)
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
-$250 CREDIT INCLUDEDCheck Your Fire Coating Price in 60 Seconds
We Offer Free Site Visits
Get My Price in 60s 647-333-3626
VERIFIED ONTARIO CODE & COST FAQ • 8 QUESTIONS ANSWERED

Frequently Asked Questions

Cementitious fireproofing—officially classified as Spray-Applied Fire-Resistive Material (SFRM)—is a wet-mixed gypsum or Portland cement coating sprayed directly onto structural steel columns, beams, open-web joists, and metal floor decks. Because structural steel loses half its strength at 538°C (1,000°F), Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings) insulate the steel and release steam endothermically during a fire so Part 3 buildings remain structurally stable.

In 2026, standard-density gypsum SFRM (Monokote® MK-6 HY / CAFCO® 300) for 1-hour to 2-hour concealed structural steel costs $2.25 to $4.25 per sq ft, while medium- and high-density Portland cement SFRM (Monokote® Z-106 / Carboline Type 7GP) for parking garages and mechanical rooms ranges from $3.85 to $7.50+ per sq ft. See our full 2026 Ontario Cementitious Fireproofing Cost Guide ($2.25–$6.50/sq ft), or Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact).

Standard 15–19 PCF gypsum SFRM (Monokote® MK-6 / CAFCO® 300) is designed strictly for dry, conditioned, concealed interior spaces such as office plenums above drop ceilings. Whenever structural steel is located in an underground parking garage, loading dock, unconditioned atrium, mechanical room, elevator shaft, or area exposed to freeze-thaw moisture or physical abrasion, you must specify 22–40+ PCF Portland cement SFRM (Grace Monokote® Z-106 / Z-146, CAFCO® 400, or Carboline Type 7GP).

SFRM thickness is never one-size-fits-all; it is calculated from the specific ULC Design Listing (tested to CAN/ULC-S101) using the steel member’s W/D ratio (weight per foot divided by heated perimeter) or A/P ratio for hollow structural steel (HSS) tubes. Lighter steel members with thin webs or flanges have a low W/D ratio and require thicker SFRM (1-1/4" to 2"+), whereas massive wide-flange columns require thinner coats (9/16" to 1") for the same hourly rating.

Cementitious fireproofing (SFRM) is a thick (3/8" to 2"+), textured grey coating for concealed structural steel or parking garages. Intumescent fire coating is a smooth, paint-like thin film (0.5–3.5 mm) that swells into a char barrier during a fire, used on Architecturally Exposed Structural Steel (AESS). DC315 is a specialized 18-mil intumescent thermal barrier applied strictly over polyurethane spray foam insulation (OBC 9.10.17.10 / 3.1.5.12), not structural steel.

Yes. On active commercial jobsites, electrical, HVAC, and plumbing trades frequently scrape SFRM off beams while installing hangers or core-drilling slabs. Our Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers perform ULC-matched patch and restoration work—re-applying compatible Monokote® or CAFCO® material to the required ASTM E605 pin thickness so your third-party engineer signs off for occupancy.

No—all modern SFRM products installed in Canada (Grace Monokote® MK-6 / Z-106, CAFCO® 300 / 400, Carboline Southwest Type 5GP / 7GP) are 100% asbestos-free, zero-VOC, and certified non-combustible under CAN/ULC-S102. Asbestos was eliminated from Canadian spray fireproofing in the 1970s/early 1980s.

Sprayfoam Solutions Toronto Inc. ((647) 333-3626) has served general contractors, developers, and building owners across Toronto, the GTA, and Ontario since 2008. We dispatch Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers backed by $5,000,000 commercial liability insurance and full WSIB clearance. Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact).

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
ONTARIO COMMERCIAL FIREPROOFING FLEET • $0 SURROUNDING GTA TRAVEL FEE Same-Week GTA & Ontario Dispatch
Explore Our Commercial Fireproofing Hubs & Local GTA Service Areas

Select your commercial fire protection scope or municipality below for CAN/ULC-S101 specs and rapid mobilization:

Our Spray Foam Insulation Services & Cost Guides
Cementitious Fireproofing2026 Cementitious SFRM Cost GuideIntumescent Fire CoatingDC315 Thermal BarrierSpray Foam + Fire Coating Packages60-Second Price Calculator
Cities & Municipalities We Serve Across Toronto, the GTA & Ontario (20 Locations)
TorontoScarboroughMississaugaBramptonVaughanMarkhamOakvilleBurlingtonHamiltonPickeringAjaxWhitbyOshawaRichmond HillNewmarketMiltonBarrieLincolnFort ErieBrantford
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

Proudly Serving Toronto, GTA & All of Ontario

Direct contractor pricing · CAN/ULC-S101 & S124 Certified · $0 Travel Fee Across Ontario

Sprayfoam Solutions service coverage map across Toronto, GTA and Ontario
50+ Cities & Municipalities

With regional mobile crews stationed right near you, we charge $0 travel fees and stand as the best, most trusted contractor to serve your home or commercial building anywhere in Ontario.

WSIB Insured
6,500+ Projects Completed
Calculate Estimate →

Get Your Free Quote

Takes 10 seconds — we'll call you back.

Free Estimate No Obligation WSIB Cleared Licensed Caliber Certified
Call 647-333-3626 (7AM–9PM)

LEGAL NOTICE & TRADE DISCLAIMER

Sprayfoam Solutions Toronto Inc. • Ontario Building Code & CAN/ULC Editorial Reference

1. Informational & Marketing Purposes Only: The articles, cost comparisons, square footage price ranges, R-value figures, energy savings estimates, and building code citations published on this website are provided strictly for general educational and editorial reference. They do not constitute certified engineering advice, architectural specifications, official building envelope evaluations, or a binding offer to contract.

2. Site-Specific Engineering Variability: Fire-protective coatings require certified on-site substrate inspection, environmental moisture testing, and custom assessment. Actual project pricing, required material thickness, building code compliance (including the Ontario Building Code and CAN/ULC standards), and municipal inspection approvals vary based on structure type, accessibility, existing substrates, ventilation, and municipal building authority jurisdictions.

3. Absolute Precedence of Written Contract: No statement on this website shall be construed as a binding guarantee, performance warranty, or contractual representation by Sprayfoam Solutions Toronto Inc. Final binding scope of work, project specifications, and certified pricing are established exclusively through a formal, signed written quote provided by an authorized Sprayfoam Solutions estimator following an on-site or certified architectural plans review. All terms, conditions, and warranties set forth in the formal written contract strictly and absolutely supersede all prior or contemporaneous verbal discussions, emails, text messages, blog articles, and online representations. For complete terms, visit our Terms of Service.

CONTINUE READING • ONTARIO INSULATION & FIRE COATING GUIDES

Related Articles

Spray Foam
Commercial Building Envelope Insulation Ontario (OBC SB-10)

Commercial Building Envelope Insulation Ontario (OBC SB-10)

Read Article
Fire Coatings
Cementitious Fireproofing Cost Per Sq Ft Ontario (2026)

Cementitious Fireproofing Cost Per Sq Ft Ontario (2026)

Read Article
Spray Foam
Basement Spray Foam Cost Ontario (2026) | Price in 60s

Basement Spray Foam Cost Ontario (2026) | Price in 60s

Read Article
Fire Coatings
Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Read Article
Spray Foam
Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Read Article
Fire Coatings
DC315 Fire Coating Guide Ontario (2026 Thermal Barrier Code)

DC315 Fire Coating Guide Ontario (2026 Thermal Barrier Code)

Read Article
SERVING ALL ONTARIO:Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock•Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock

About Sprayfoam Solutions Toronto Inc

6,500+ projects completed since 2008. The Greater Toronto Area's trusted spray foam insulation & fireproofing contractor for commercial builders, general contractors, and homeowners.

647-333-3626Request a Quote
50 Howden Rd, Scarborough, ON M1R 3E4
100% Canadian Owned & OperatedLicensed • Up to $10M Insured • WSIB Clearance

Our Services

  • ›Spray Foam (Residential)
  • ›Spray Foam (Commercial)
  • ›Interior Sound Dampening
  • ›Fire Coating DC315
  • ›Cementitious Fireproofing
  • ›Intumescent Coating

Expert Guides

  • What is Spray Foam Insulation?
  • How Much Does Spray Foam Cost?
  • Our Chemicals & Technical Data
  • Customer Reviews (5.0 ★)
  • View Our Projects
  • Book Free On-Site Inspection

Areas We Serve

  • •Toronto & Central GTA
  • •Mississauga & Peel
  • •Oakville & Halton
  • •Vaughan & York Region
  • •Barrie & Simcoe County
  • •Muskoka & Cottage Country
  • •Waterloo & Tri-Cities
  • •Oshawa & Durham Region
  • + View All 50+ Cities
All project estimates, pricing illustrations, R-value metrics, and building code references on this website are for general informational purposes only and do not constitute a certified estimate or binding offer to contract. Formal written contracts provided by Sprayfoam Solutions Toronto Inc. following an on-site inspection strictly supersede all online representations. Subject to our Terms of Service and Privacy Policy.
AboutView Our WorkCustomer Reviews 5.0 ★CertificationsServicesAreas We ServeBlogContact UsTerms of ServicePrivacy Policy
© 2026 Spray Foam Solutions Toronto Inc. All Rights Reserved.