Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home

Residential

Major Projects
  • Custom New Homes
  • Additions & Renovations
  • Muskoka Cottages & Homes
  • Exterior Walls
  • Interior Ceiling Sound Dampening
Targeted Areas
  • Basements
  • Attics & Roof Decks
  • Crawl Spaces
  • Rim Joist Headers
  • Garages & Floors Over Garage
  • Cathedral Ceilings
  • Cantilevers & Overhangs
  • Under-Slab & Radiant Floors
  • Cold Rooms
  • RVs & Vans
  • Swimming Pools

Commercial

Buildings & Facilities
  • Commercial SPF & Fire Coating
  • Warehouse & Industrial
  • Metal Buildings
  • Barns & Agricultural
  • Multi-Unit Buildings
  • Flat Roof Systems
Specialty
  • Shipping Containers
  • Silos & Water Tanks

Code & Expert Guides

  • What is Spray Foam?
  • Cost of Spray Foam
  • Our Sprayfoam Chemicals
  • Certifications & Standards
  • Spray Foam Knowledge Base
Ontario Code & ULC Guides
  • Ontario R-Value & Code Guide
  • CAN/ULC-S705.2 Code Rules
  • Open-Cell vs. Closed-Cell

Thermal Barriers (Foam)

Core Systems
  • DC315 Intumescent Coating
  • Sprayfoam & Fire Coating (2-in-1)
Where Code Requires It
  • Mechanical & Furnace Rooms
  • Exposed Basements & Crawls
  • Attached Garage Ceilings
  • Warehouse Exposed Foam Decks
  • Unvented Attics & Roof Decks
  • Rim Joists & Floor Headers

Structural Fireproofing

Fireproofing Systems
  • Cementitious Fireproofing (SFRM)
  • Intumescent Fire Coating (Thin-Film)
Structural Assemblies
  • Structural Beams & Columns
  • Metal Floor & Roof Decks
  • Commercial Parkades & Garages
  • Architectural Exposed Steel (AESS)
  • Request Fire Spec & Quote

Code & Expert Guides

  • What is DC315 Fire Coating?
  • Cost of DC315 Fire Coating
  • Our Fire Coating Chemicals
  • Certifications & Standards
  • Fire Coating Knowledge Base
Ontario Code & ULC Guides
  • Ontario 15-Min Thermal Barrier
  • ULC 1–4 Hr Steel Ratings
  • DC315 vs. Type X Drywall
Locations
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviews
Contact UsGet My Pricing
Serving GTA & Beyond
Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home
Spray Foam Services
Overview & Guides
What is Spray Foam?Cost of Spray FoamOpen-Cell vs. Closed-CellOntario R-Value & Code Guide
Project Applications
Custom New HomesAdditions & RenovationsMuskoka Cottages & HomesExterior WallsInterior Ceiling Sound DampeningBasementsAttics & Roof DecksCrawl SpacesRim Joist HeadersGarages & Floors Over GarageCathedral CeilingsCantilevers & OverhangsUnder-Slab & Radiant FloorsCold RoomsRVs & VansSwimming Pools
Overview & Guides
Commercial SPF & Fire Coating OverviewCAN/ULC-S705.2 Code RulesCost of Spray Foam
Project Applications
Warehouse & IndustrialMetal BuildingsBarns & AgriculturalMulti-Unit BuildingsFlat Roof SystemsShipping ContainersSilos & Water Tanks
Overview & Guides
Our Sprayfoam ChemicalsCertifications & StandardsSpray Foam Knowledge Base
Fire Coatings
Overview & Guides
DC315 Fire Coating OverviewSprayfoam & DC315 Package (2-in-1)What is DC315 Fire Coating?Cost of DC315 Fire CoatingDC315 vs. Type X DrywallOntario 15-Min Thermal Barrier
Project Applications
Mechanical & Furnace RoomsExposed Basements & CrawlsAttached Garage CeilingsWarehouse Exposed Foam DecksUnvented Attics & Roof DecksRim Joists & Floor Headers
Overview & Guides
Intumescent Fire Coating OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Structural Beams & ColumnsArchitectural Exposed Steel (AESS)Request Fire Spec & Quote
Overview & Guides
Cementitious Fireproofing OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Metal Floor & Roof DecksCommercial Parkades & GaragesRequest Fire Spec & Quote
Overview & Guides
Our Fire Coating ChemicalsCertifications & StandardsFire Coating Knowledge Base
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviewsContact Us
More Info & Resources
› About Us› Certifications› All Services› Blog & Guides
We Serve GTA & Across Ontario!
Get My Pricing 647-333-3626
Back to Blog·Fire Coatings
8 min read·Updated Oct 15, 2026

Cementitious Fireproofing Cost Per Square Foot in Ontario (2026 Monokote MK-6, CAFCO 300 & Structural Steel Price Guide)

2026 ONTARIO QUICK COST & CODE SUMMARY SB-12 & CAN/ULC Verified

In Ontario, spray-applied cementitious fireproofing (SFRM) costs $2.25 to $4.25 per sq ft for 1–2 hour standard-density gypsum (Grace Monokote® MK-6 / CAFCO® 300) and $4.25 to $7.50+ per sq ft for medium/high-density Portland cement SFRM (Monokote® Z-106 / Carboline Type 5GP/7GP).

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
Sprayfoam Solutions Toronto Inc.· Caliber Certified (CAN/ULC-S705.2)
Cementitious Fireproofing Cost Per Square Foot in Ontario (2026 Monokote MK-6, CAFCO 300 & Structural Steel Price Guide)
ONTARIO BUILDING CODE & ENGINEERING BRIEF
2026 OBC SB-12 & CAN/ULC-S705.1 Reference
  • Commercial cementitious fireproofing (SFRM) pricing in Ontario is calculated by board-foot yield and required CAN/ULC-S101 thickness (typically 3/8" to 2-1/4" based on each steel member’s W/D or A/P section factor).

Installed by Sprayfoam Solutions Toronto Inc., Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings) average $1.85 to $3.15 per board foot installed, including poly containment, ULC bonding primers, and ASTM E605 pin-depth verification.

GUIDE NAVIGATION • 7 SECTIONS Click Any Topic to Jump
In This 2026 Ontario Guide (Quick Jump Links)
  1. 01Cementitious Fireproofing Cost Per Square Foot in Ontario (2026 Monokote MK-6, CAFCO 300 & Structural Steel Price Guide): 2026 Ontario Overview & Code Essentials
  2. 022026 Cementitious Fireproofing Cost Per Square Foot & Board Foot in Ontario (By Rating & Density)
  3. 03Ontario Building Code Part 3 Compliance & Inspector Spec Sheet (2026)
  4. 042026 Cost Comparison: Cementitious SFRM vs. Intumescent Fire Coating vs. DC315
  5. 05How to Cut 15%–30% Off Your Commercial Cementitious Fireproofing Cost Without Risking Failed Inspections
  6. 06Our 4-Step Commercial SFRM Estimating & Installation Process ($0 GTA Travel Fee)
  7. 07Frequently Asked Questions
PROJECT HIGHLIGHT • ETOBICOKE, ON
Structural Steel Intumescent & SFRM Fireproofing
1-Hr to 2-Hr • CAN/ULC-S101
Thin-Film Intumescent & Cementitious SFRM (MasterFormat 07 81 00)
  • 12,000 sq ft W-Beams, HSS Columns & Fluted Decking
  • CAN/ULC-S101 Listed Designs (F900 / D900 / Z600)
  • Full DFT / ASTM E605 QA Verification Package
VERIFIED GOOGLE REVIEW • 5.0 ★★★★★ (56+)
NK
Nikola
Verified Google Customer • Sprayfoam Solutions Toronto

“Professional service from start to finish. Fair pricing, great communication, and the installers did a super clean job. Highly recommend Sprayfoam Solutions Toronto.”

  • 5.0 ★ Rating Across 56+ Verified Google Reviews

Cementitious Fireproofing Cost Per Square Foot in Ontario (2026 Monokote MK-6, CAFCO 300 & Structural Steel Price Guide): 2026 Ontario Overview & Code Essentials

Estimating cementitious fireproofing cost per square foot in Ontario requires more than a flat allowance. On Part 3 commercial buildings across Toronto, Mississauga, Vaughan, Brampton, and Hamilton, structural steel fireproofing unit rates depend on required CAN/ULC-S101 fire-resistance duration (1, 1.5, 2, 3, or 4 hours), the W/D or A/P section factor of your wide-flange beams and HSS columns, and whether the blueprint specifies standard-density gypsum (15–19 PCF) or moisture-resistant Portland cement (22–40+ PCF).

At Sprayfoam Solutions Toronto Inc., our Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers supply and install Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings). For technical ULC engineering rules, see our companion Complete Ontario Cementitious Fireproofing (SFRM) Engineering Guide, or Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact).

2026 Ballpark Cementitious Fireproofing (SFRM) Cost by Project Scope (Ontario)

Compare our 3 most common Ontario commercial & industrial structural steel SFRM pricing tiers before requesting your blueprint takeoff:

1-Hr to 2-Hr • Concealed Steel
Standard-Density Gypsum SFRM
$2.25 – $4.25 / sq ft
$1.85 – $2.45 / board foot installed
  • 15–19 PCF Monokote® MK-6 HY / CAFCO® 300 / Type 5GP
  • Concealed Columns, Beams & Pan Decks
  • Includes $250 Credit
Get My Price in 60s
Most Popular • Parking & Mech
Medium/High-Density Portland SFRM
$4.25 – $7.50+ / sq ft
$2.50 – $3.45 / board foot installed
  • 22–40+ PCF Monokote® Z-106 / Z-146 / CAFCO® 400 / Type 7GP
  • Underground Garages & Mechanical Rooms
Get My Price in 60s
Occupancy Fast-Track • ULC Match
SFRM Patch, Repair & Retrofit Scopes
24–48 Hr Turnaround
Includes ASTM E605 Pin Verification
  • Trade-Damage Patching, Tenant Fit-Outs & Mezzanine Steel Additions
  • Includes $250 Estimate Credit
Get My Price in 60s

2026 Cementitious Fireproofing Cost Per Square Foot & Board Foot in Ontario (By Rating & Density)

In commercial estimating, cementitious fireproofing material yield is calculated by the board foot (1 sq ft of wetted steel surface area at 1 inch thick) and converted into a turnkey cost per square foot of developed steel surface area. In 2026, standard-density gypsum SFRM averages $1.85 to $2.45 per board foot, while Portland cement medium/high-density SFRM ranges from $2.50 to $3.45 per board foot installed:

Swipe table horizontally on mobile to compare all columns
Structural Steel Scope & SFRM ProductFire Rating & Typical Thickness2026 Installed Cost (/sq ft)Typical Commercial Project BudgetOntario Building Code Part 3 Status
1-Hour Concealed Beams, Columns & Decks(Monokote MK-6 HY / CAFCO 300)
1-Hr CAN/ULC-S101(3/8" – 3/4" at 15 PCF)
$2.25 – $3.25 / sq ft
$11,250 – $26,000(5,000–8,000 sq ft steel)
Passes Part 3 Commercial Up to 6 Storeys
2-Hour Concealed High-Rise Structural Steel(Monokote MK-6 HY / Type 5GP)
2-Hr CAN/ULC-S101(7/8" – 1-1/2" at 15 PCF)
$3.15 – $4.25 / sq ft
$31,500 – $85,000(10,000–20,000 sq ft steel)
Passes Part 3 High-Rise & Multi-Res Towers
Open-Web Steel Joists (OWSJ) & Roof Trusses(MK-6 HY / CAFCO 300)
1-Hr to 2-Hr(3/4" – 1-5/8" + Chord Factor)
$3.25 – $5.50 / sq ft
$16,000 – $44,000(Warehouse / Retail Roofs)
Includes 360° Web & Chord Overspray Factor
Underground Parking Garage Soffits & Beams(Monokote Z-106 / Type 7GP)
1.5-Hr to 2-Hr(1/2" – 1-1/2" at 22 PCF)
$4.25 – $5.95 / sq ft
$25,500 – $71,000(Freeze-Thaw & Salt Safe)
High-Bond Portland Cement(≥430 PSF)
High-Density Industrial & 3–4 Hour Assemblies(Monokote Z-146 / Pyrocrete)
3-Hr to 4-Hr(1-1/4" – 2-1/4" at 40+ PCF)
$5.50 – $7.50+ / sq ft
$45,000 – $150,000+(Hospitals / Industrial)
Maximum Impact & Moisture Resistance
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

How Steel W/D Section Factors and Open-Web Joists Affect Your Square-Foot Price

Two commercial buildings with the exact same floor footprint can have a 35% difference in cementitious fireproofing cost depending on the structural steel schedule. Under CAN/ULC-S101, wide-flange columns and beams with heavy webs and thick flanges (a high W/D ratio) retain thermal mass and require as little as 1/2" to 3/4" of Monokote® MK-6 for a 1-to-2-hour rating. Conversely, lightweight open-web steel joists (OWSJ), thin-walled HSS tubular columns, and castellated beams have a large heated perimeter relative to their steel weight—requiring 1-1/4" to 2"+ of SFRM plus a 25% to 35% spray-loss allowance around open lattice chords.

Commercial warehouse structural steel roof joists, wide-flange beams, and columns priced for fireproofing in Ontario
Open-web steel joists (OWSJ) and wide-flange girders in an Ontario commercial facility—where W/D section factors and chord geometry govern board-foot SFRM material consumption.

5 Site & Blueprint Variables That Move Commercial SFRM Pricing Up or Down

When our commercial estimating desk prepares a lump-sum tender or unit-price schedule for a general contractor, we evaluate five jobsite cost drivers:

  • 1. Standard Gypsum (15 PCF) vs. Medium/High-Density Portland Cement (22–40+ PCF): Upgrading from standard interior gypsum (Grace Monokote® MK-6 HY / CAFCO® 300 at $2.25–$4.25/sq ft) to moisture- and abrasion-resistant Portland cement (Monokote® Z-106 / Carboline Southwest Type 7GP at $4.25–$7.50+/sq ft) adds 25% to 45% in material and pump wear but prevents delamination in parking garages, loading docks, and mechanical rooms.
  • 2. Single-Mobilization Open Deck vs. Multi-Floor Phased Mobilizations: Spraying 15,000+ sq ft of open structural steel in a single continuous mobilization before interior walls or MEP racks are hung achieves our lowest unit rate ($2.25–$3.25/sq ft). Multi-phase schedules requiring 3 to 5 separate rig mobilizations or floor-by-floor remobilization add 20% to 35% in setup and containment labour.
  • 3. Working Height, Scissor Lifts & High-Bay Boom Access: Standard deck heights under 16 feet are sprayed rapidly from rollingbaker scaffolds or compact electric scissor lifts. High-bay warehouses (24–40 ft), atrium transfer beams, and stairwell shafts requiring articulating boom lifts or engineered bridging add equipment rental and operator time.
  • 4. ULC Bonding Primers, Galvanized Deck Prep & Metal Lath: Painted structural steel, galvanized composite pan decks, and deep-flange girders with thick multi-pass coats often require a ULC-listed acrylic bonding agent (Monokote® Accelerator / CAFCO Bond-Seal at +$0.35–$0.65/sq ft) or mechanical rib lath to satisfy ASTM E736 bond-strength pull tests.
  • 5. Winter Heating, Hoarding & Negative-Pressure Containment: Because wet-mixed SFRM requires minimum 4°C (40°F) steel and ambient temperatures for 24 hours before and after application, winter commercial schedules in unenclosed frames require temporary poly hoarding and indirect-fired heaters.
Structural steel column and beam connection encapsulated with high-build protective coating in Toronto
Multi-pass structural column and beam encapsulation—built to exact ULC design thickness to pass third-party ASTM E605 pin-depth inspections without costly rework.
-$250 CREDIT INCLUDEDCheck Your Fire Coating Price in 60 Seconds
We Offer Free Site Visits
Get My Price in 60s 647-333-3626

Ontario Building Code Part 3 Compliance & Inspector Spec Sheet (2026)

Every commercial fireproofing quote from Sprayfoam Solutions Toronto Inc. is engineered around 2026 Ontario Building Code Part 3 (Sections 3.1.7 & 3.2.2) and CAN/ULC-S101 CCMC/ULC fire endurance listings so your project passes municipal and third-party engineering sign-off on the first inspection:

COMMERCIAL ESTIMATING & QA/QC SPEC SHEET • ONTARIO PART 3 2026 Ontario Building Code Verified
What Is Included in Every Turnkey SFRM Quote from Sprayfoam Solutions Toronto Inc.
01Approved SFRM Products
Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (Standard, Medium & High-Density Portland Cement / Gypsum SFRM) tested to CAN/ULC-S101 (1-Hour to 4-Hour Fire-Resistance Ratings)
02Installer Certification
Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers
03Takeoff & Design Methodology
Exact W/D & A/P Section-Factor Takeoff Matched to ULC Design Listings (Z700, D900, F900, I900 Series)
04Field Inspection Verification
ASTM E605 Calibrated Pin-Depth & Dry-Density Logs + ASTM E736 Cohesive/Adhesive Bond Compliance
05Containment & Cleanup Scope
Full Polyethylene Masking of Curtain Walls, Windows & MEP Equipment + Floor Scrape & Bagged Cleanup
06Commercial Insurance & WSIB
$5,000,000 Commercial General Liability Insurance • Active Ontario WSIB Clearance Certificate
COST & SPEC BREAKDOWN • INTERACTIVE STEEL ASSEMBLIES
Compare 2026 SFRM Cost & Specs by Structural Steel Zone
SYSTEM / COATING TYPE
15–19 PCF Gypsum SFRM(Monokote MK-6 HY / CAFCO 300)

Lowest cost per sq ft for dry concealed interiors.

REQUIRED THICKNESS
3/8" – 1-1/2" depth(1-Hr to 2-Hr CAN/ULC-S101)

$2.25 – $4.25 / sq ft turnkey installed.

CODE & FIRE PERFORMANCE
≥ 200 PSF Bond(ASTM E736 Verified)

High-speed pumping for offices, condos & retail.

APPLICATION RATIONALE

When structural steel columns, beams, and floor decks are concealed above suspended acoustic ceilings or behind gypsum shaft walls, 15–19 PCF standard-density gypsum SFRM (Grace Monokote MK-6 HY, CAFCO 300, or Carboline Type 5GP) delivers 1-to-2-hour CAN/ULC-S101 protection at the lowest cost per square foot ($2.25–$4.25/sq ft).

CONCRETE FOUNDATION WALL1/2" DRYWALL (THERMAL BARRIER)$2.25–$4.25 / SQ FT INSTALLED15–19 PCF STANDARD GYPSUM SFRMFREEZING DAMP SOILWARM & COZY BASEMENT
SYSTEM / COATING TYPE
22–30 PCF Portland SFRM(Monokote Z-106 / Type 7GP)

Hydraulic cement resists humidity, salt & abrasion.

REQUIRED THICKNESS
1/2" – 1-3/4" depth(1.5-Hr to 3-Hr CAN/ULC-S101)

$3.85 – $5.75 / sq ft turnkey installed.

CODE & FIRE PERFORMANCE
≥ 430 PSF Bond(Freeze-Thaw & Moisture Safe)

Built for underground garages & mechanical rooms.

APPLICATION RATIONALE

Underground parking podiums, unheated loading bays, and mechanical penthouses expose steel coatings to exhaust fumes, road-salt mist, freeze-thaw cycling, and high-velocity air movement. Medium-density Portland cement SFRM (Monokote Z-106 or CAFCO 400) prevents flaking and costly moisture repairs.

CONCRETE FOUNDATIONWOOD SILL PLATERIM JOISTMAIN FLOOR SUBFLOORFLOOR JOIST CAVITY (SIDE VIEW)$3.85–$5.75 / SQ FT INSTALLED22–30 PCF PORTLAND CEMENT SFRMOUTSIDE COLD AIR & MOISTUREWARM & DRAFT-FREE BASEMENT
SYSTEM / COATING TYPE
40+ PCF / ULC Patch(Monokote Z-146 / Pyrocrete)

Extreme impact resistance & occupancy patch sign-offs.

REQUIRED THICKNESS
3/4" – 2-1/4" depth(2-Hr to 4-Hr CAN/ULC-S101)

$5.25 – $7.50+ / sq ft (or Fast-Track Patch).

CODE & FIRE PERFORMANCE
≥ 1,000 PSF Bond(Industrial & Occupancy Ready)

Passes third-party engineering inspections fast.

APPLICATION RATIONALE

For exposed industrial columns, transit structures, or urgent pre-occupancy patching where MEP trades have scraped existing fireproofing, our certified installers apply high-density Portland cement SFRM or ULC-matched patch restorations complete with ASTM E605 pin-depth records.

MAIN FLOOR SUBFLOOR (PLYWOOD / OSB)RESILIENT CHANNEL + 5/8" TYPE X DRYWALL CEILING1,000+ PSF IMPACT RESISTANCEMAIN FLOOR LIVING SPACE (FOOTSTEPS & VOICES)QUIET BASEMENT APARTMENT / SUITE (FAST-TRACK OCCUPANCY SIGN-OFF)

THE SPRAY FOAM EXPERTS

That Actually Lower Your Energy Bills
★★★★★5.0 Google Rating•55+ Verified Reviews•Serving Across Ontario
STEP 1: 60-SECOND PRICE CHECK
LOCK IN DIRECT CONTRACTOR PRICING

Fast Response & Quotes · No Commitment!

Tap to Select Your Project:
or call directly: 647-333-3626
VERIFIED, CERTIFIED & LISTED ON
Google5.0 ★ Verified
HomeStarsVerified Pro
Houzz ProListed Contractor
TrustedProsCanadian Directory
Caliber CertifiedCAN/ULC-S705.2
WSIB & CCMCOntario Cleared

2026 Cost Comparison: Cementitious SFRM vs. Intumescent Fire Coating vs. DC315

Architects and commercial estimators frequently compare cementitious SFRM pricing against architectural intumescent fire coating cost (see our Intumescent Fire Coating Ontario Guide) and DC315 thermal barrier coating over spray foam (compare DC315 vs. Drywall Thermal Barrier and 2026 Ontario Spray Foam Cost). Here is how the 2026 installed square-foot rates compare across Ontario:

Swipe table horizontally on mobile to compare all columns
Fire Protection System2026 Installed Cost (/sq ft)Target Substrate & Aesthetic FinishCode & Test StandardBest Commercial Use Case
Standard Gypsum SFRM(Monokote MK-6 / CAFCO 300)
$2.25 – $4.25 / sq ft
Concealed Structural Steel(Rough grey textured coat)
CAN/ULC-S101(1 Hr to 2 Hr)
85% of Commercial Steel(Above ceilings & inside shafts)
Medium/High-Density Portland SFRM(Monokote Z-106 / Type 7GP)
$4.25 – $7.50+ / sq ft
Exposed Utility Steel(Hard cementitious finish)
CAN/ULC-S101(1.5 Hr to 4 Hr)
Parking Garages, Loading Docks & Mechanical Rooms
Thin-Film Intumescent Steel Coating(Architectural AESS Paint)
$6.50 – $14.50+ / sq ft
Exposed Feature Steel (AESS)(Smooth architectural matte)
CAN/ULC-S101(1 Hr to 2 Hr)
Atriums, Feature Lobbies, Retail & Exposed Columns
DC315 Intumescent Thermal Barrier(Over Polyurethane Spray Foam)
$1.85 – $3.25 / sq ft
2 lb Closed-Cell Spray Foam(18 mils WFT / 12 mils DFT)
CAN/ULC-S124 / S101M(OBC 3.1.5.12)
Exposed Spray Foam in Warehouses & Rim Joists
Hybrid Tower Value-Engineering(90% SFRM + 10% Intumescent)
Saves 35% – 55% Overall
SFRM Above Ceilings + Intumescent in Lobby Only
CAN/ULC-S101(Single-Contractor Scope)
Office Towers, Condos, Schools & Municipal Builds
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Combine Concealed Cementitious SFRM with Lobby Intumescent Under One Contract
Get My Price in 60s

Instead of paying $8.00–$14.50/sq ft for thin-film intumescent paint across an entire commercial floorplate, specify standard Monokote MK-6 / CAFCO 300 ($2.25–$4.25/sq ft) on the 90% of structural steel hidden above drop ceilings, and reserve architectural intumescent coating for the 10% of exposed lobby columns. Sprayfoam Solutions Toronto Inc. executes both scopes plus commercial spray foam under one mobilized contract.

How to Cut 15%–30% Off Your Commercial Cementitious Fireproofing Cost Without Risking Failed Inspections

Our Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers help Ontario general contractors, project managers, and property owners eliminate unnecessary change orders through six practical pre-construction steps:

  • 1. Schedule SFRM Spraying Before MEP Ductwork, Cable Trays & Sprinkler Mains Are Hung: Spraying wide-flange beams and metal pan decks while the floorplate is open increases daily crew production from 1,500 sq ft/day to 4,000+ sq ft/day and eliminates expensive poly masking of finished ductwork.
  • 2. Pre-Install Welded Clips, Partition Top-Tracks & Trapeze Hangers: Coordinate mechanical and drywall sub-trades to install their structural steel clips before our SFRM crew mobilizes so nobody scrapes off cured fireproofing and triggers a patch-and-reinspection charge.
  • 3. Bundle Structural Steel SFRM + Commercial Spray Foam Insulation: If your project also requires commercial warehouse insulation, under-slab parking garage insulation, or spray foam and fire coating packages, bundling both scopes with Sprayfoam Solutions Toronto Inc. eliminates duplicate mobilization fees.
  • 4. Submit Structural Steel Schedules (W/D Ratios) Early: Providing the structural engineer’s beam and column schedule alongside the architectural life-safety drawings allows our estimators to calculate exact ULC board-foot thicknesses rather than padding quotes with worst-case thickness contingencies.
  • 5. Specify Medium-Density Z-106 Only Where Environmental Exposure Requires It: Use Monokote® Z-106 / CAFCO® 400 in damp parking structures, loading bays, and mechanical rooms, and switch to cost-effective Monokote® MK-6 HY / CAFCO® 300 on dry upper office and residential floors.
  • 6. Book Pre-Occupancy Patch & Pin-Depth Verification Before Ceiling Closure: Have our crew complete any trade-damage touch-ups and deliver your ASTM E605 thickness log before acoustic ceiling tiles drop into the grid.
Commercial fireproofing installer spraying fire-resistive material onto overhead structural beams in Toronto, Ontario
High-production commercial spray application by Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers across Toronto and the GTA.
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds or Upload Drawings
Get My Price in 60s

Need a fast budget number for a client pro-forma or a firm unit-price bid from structural drawings? Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact) directly to our senior commercial fireproofing estimators.

Our 4-Step Commercial SFRM Estimating & Installation Process ($0 GTA Travel Fee)

We charge $0 Travel Fee across Toronto and surrounding GTA municipalities, mobilizing commercial rotor-stator fireproofing rigs and self-contained spray trucks across Ontario:

TURNKEY COMMERCIAL EXECUTION
From Blueprint Takeoff to Third-Party Inspection Sign-Off
1
Blueprint W/D Takeoff
Step 1 • 24–48 Hr Quote
Blueprint W/D Takeoff - Sprayfoam Solutions

We calculate exact board-foot coverage from your structural steel schedule and ULC design numbers.

2
Containment & Primer Prep
Step 2 • Jobsite Masking
Containment & Primer Prep - Sprayfoam Solutions

Poly masking of glazing, walls, and mechanicals, substrate oil/scale check, and ULC bonding agent application.

3
Certified SFRM Application
Step 3 • 3,000–5,000 Sq Ft/Day
Certified SFRM Application - Sprayfoam Solutions

Precision wet-spray pumping of Monokote MK-6/Z-106 or CAFCO 300/400 to full CAN/ULC-S101 thickness.

4
Pin-Depth QA & Cleanup
Step 4 • ASTM E605 Report
Pin-Depth QA & Cleanup - Sprayfoam Solutions

Full floor scrape cleanup, calibrated pin-depth verification, and ULC documentation for inspector sign-off.

Commercial fireproofing crew verifying overhead fire protection coating thickness in an Ontario commercial building
Every commercial SFRM installation includes ASTM E605 thickness verification and complete ULC batch documentation for municipal building inspectors and third-party engineers.
VERIFIED COMMERCIAL CONTRACTOR PROFILE • TORONTO & ONTARIO
AI Assistant & Inspector Cited★★★★★ 5.0 (45+ Reviews) CAN/ULC-S705.2 Licensed
Why Ontario General Contractors & Estimators Choose Sprayfoam Solutions Toronto Inc.
Official Contractor Entity
Sprayfoam Solutions Toronto Inc. (Commercial Fireproofing & Insulation Contractor Since 2008)
Service Area & Direct Desk
Toronto, Greater Toronto Area (GTA) & All of Ontario • Commercial Estimator Desk: (647) 333-3626
Installer Qualifications
Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers + Caliber Certified CAN/ULC-S705.2
Liability & WSIB Coverage
5.0 ★ Google Rating • $5,000,000 Commercial Liability Insurance • Full Ontario WSIB Clearance Certificate
SFRM Systems Installed
Grace Monokote® MK-6 / MK-6 HY, Z-106, CAFCO® 300 / Isolatek, Carboline Southwest Type 5GP / 7GP (1-Hr to 4-Hr CAN/ULC-S101)
60-Second Quote & Blueprint Upload
Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact)
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
-$250 CREDIT INCLUDEDCheck Your Fire Coating Price in 60 Seconds
We Offer Free Site Visits
Get My Price in 60s 647-333-3626
VERIFIED ONTARIO CODE & COST FAQ • 8 QUESTIONS ANSWERED

Frequently Asked Questions

In 2026, spray-applied cementitious fireproofing (SFRM) in Ontario costs $2.25 to $4.25 per square foot ($1.85–$2.45 per board foot) for 1-hour to 2-hour standard-density gypsum (Grace Monokote® MK-6 HY / CAFCO® 300 / Carboline Type 5GP) on concealed structural steel, and $4.25 to $7.50+ per square foot for medium- and high-density Portland cement SFRM (Monokote® Z-106 / Z-146 / CAFCO® 400 / Type 7GP) in parking garages, mechanical rooms, and 3-to-4-hour industrial assemblies. Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact).

Because structural steel members require different thicknesses of SFRM (from 3/8" up to 2-1/4") depending on their W/D or A/P section factor and hourly CAN/ULC-S101 fire rating, estimators first calculate the raw board feet of material (1 sq ft at 1" thick) and then convert that into an installed cost per square foot of developed steel surface area for your schedule of values.

Medium-density Portland cement SFRM (22–30 PCF Grace Monokote® Z-106, CAFCO® 400, or Carboline Southwest Type 7GP) typically costs 25% to 45% more ($3.85–$5.75/sq ft) than 15 PCF standard gypsum SFRM ($2.25–$4.25/sq ft). However, Portland cement SFRM delivers over 430 PSF bond strength and is mandatory in underground parking garages, unheated loading docks, elevator hoistways, and damp mechanical rooms where standard gypsum would soften and delaminate.

Yes—on concealed structural steel, cementitious SFRM ($2.25–$4.25/sq ft) is roughly 50% to 70% less expensive than thin-film architectural intumescent fire coating ($6.50–$14.50+/sq ft). Most Ontario commercial towers use SFRM on the 85%–95% of steel hidden above ceilings and reserve intumescent coating strictly for exposed feature columns and atrium trusses.

Trade-damage patching, spall repair, and tenant fit-out SFRM restoration are priced based on the affected steel area, required ULC Design Listing thickness, lift access, and poly containment requirements. Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact) with photos of your steel beams or deck for rapid same-week GTA dispatch and ASTM E605 pin-depth documentation.

On an open, unobstructed commercial deck prior to MEP rough-in, a single commercial rotor-stator pump crew from Sprayfoam Solutions Toronto Inc. sprays 3,000 to 5,000 square feet of structural steel surface area per day. Heavily congested ceiling plenums, high-bay boom-lift work, or multi-coat 3-to-4-hour ratings average 1,200 to 2,500 sq ft per day.

Yes. Every commercial quote from Sprayfoam Solutions Toronto Inc. includes polyethylene masking of adjacent glazing and equipment, ULC-required bonding primers where specified, multi-pass application by Certified Commercial Fireproofing & Spray-Applied Fire-Resistive Material (SFRM) Installers, floor scraping and bagging of overspray, and complete ASTM E605 thickness logs and product lot data for your third-party inspection consultant.

Call our commercial estimating desk at (647) 333-3626, Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) or Submit Blueprints (/contact) with your structural steel schedule and architectural fire-rating drawings. We turn around full W/D section-factor takeoffs within 24 to 48 hours across Toronto, the GTA, and all of Ontario.

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
TORONTO & GTA COMMERCIAL FLEET • $0 SURROUNDING GTA TRAVEL FEE Same-Week GTA & Ontario Dispatch
Explore Our Commercial Fireproofing Hubs & GTA Service Areas

Select a fire protection service hub or GTA municipality below for local Part 3 code specs and mobilization availability:

Our Spray Foam Insulation Services & Cost Guides
Cementitious FireproofingCementitious SFRM Technical GuideIntumescent Fire CoatingDC315 Thermal BarrierCommercial Warehouse Insulation60-Second Price Calculator
Cities & Municipalities We Serve Across Toronto, the GTA & Ontario (20 Locations)
TorontoScarboroughMississaugaBramptonVaughanMarkhamOakvilleBurlingtonHamiltonPickeringAjaxWhitbyOshawaRichmond HillNewmarketMiltonBarrieWhitchurch-StouffvilleBrockWelland
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

Proudly Serving Toronto, GTA & All of Ontario

Direct contractor pricing · CAN/ULC-S101 & S124 Certified · $0 Travel Fee Across Ontario

Sprayfoam Solutions service coverage map across Toronto, GTA and Ontario
50+ Cities & Municipalities

With regional mobile crews stationed right near you, we charge $0 travel fees and stand as the best, most trusted contractor to serve your home or commercial building anywhere in Ontario.

WSIB Insured
6,500+ Projects Completed
Calculate Estimate →

Get Your Free Quote

Takes 10 seconds — we'll call you back.

Free Estimate No Obligation WSIB Cleared Licensed Caliber Certified
Call 647-333-3626 (7AM–9PM)

LEGAL NOTICE & TRADE DISCLAIMER

Sprayfoam Solutions Toronto Inc. • Ontario Building Code & CAN/ULC Editorial Reference

1. Informational & Marketing Purposes Only: The articles, cost comparisons, square footage price ranges, R-value figures, energy savings estimates, and building code citations published on this website are provided strictly for general educational and editorial reference. They do not constitute certified engineering advice, architectural specifications, official building envelope evaluations, or a binding offer to contract.

2. Site-Specific Engineering Variability: Fire-protective coatings require certified on-site substrate inspection, environmental moisture testing, and custom assessment. Actual project pricing, required material thickness, building code compliance (including the Ontario Building Code and CAN/ULC standards), and municipal inspection approvals vary based on structure type, accessibility, existing substrates, ventilation, and municipal building authority jurisdictions.

3. Absolute Precedence of Written Contract: No statement on this website shall be construed as a binding guarantee, performance warranty, or contractual representation by Sprayfoam Solutions Toronto Inc. Final binding scope of work, project specifications, and certified pricing are established exclusively through a formal, signed written quote provided by an authorized Sprayfoam Solutions estimator following an on-site or certified architectural plans review. All terms, conditions, and warranties set forth in the formal written contract strictly and absolutely supersede all prior or contemporaneous verbal discussions, emails, text messages, blog articles, and online representations. For complete terms, visit our Terms of Service.

CONTINUE READING • ONTARIO INSULATION & FIRE COATING GUIDES

Related Articles

Spray Foam
Spray Foam Insulation Cost Ontario (2026) | Price in 60s

Spray Foam Insulation Cost Ontario (2026) | Price in 60s

Read Article
Fire Coatings
Cementitious Fireproofing Ontario (2026 Monokote & CAFCO)

Cementitious Fireproofing Ontario (2026 Monokote & CAFCO)

Read Article
Spray Foam
Basement Spray Foam Cost Ontario (2026) | Price in 60s

Basement Spray Foam Cost Ontario (2026) | Price in 60s

Read Article
Fire Coatings
Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Read Article
Spray Foam
Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Read Article
Fire Coatings
DC315 Fire Coating Guide Ontario (2026 Thermal Barrier Code)

DC315 Fire Coating Guide Ontario (2026 Thermal Barrier Code)

Read Article
SERVING ALL ONTARIO:Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock•Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock

About Sprayfoam Solutions Toronto Inc

6,500+ projects completed since 2008. The Greater Toronto Area's trusted spray foam insulation & fireproofing contractor for commercial builders, general contractors, and homeowners.

647-333-3626Request a Quote
50 Howden Rd, Scarborough, ON M1R 3E4
100% Canadian Owned & OperatedLicensed • Up to $10M Insured • WSIB Clearance

Our Services

  • ›Spray Foam (Residential)
  • ›Spray Foam (Commercial)
  • ›Interior Sound Dampening
  • ›Fire Coating DC315
  • ›Cementitious Fireproofing
  • ›Intumescent Coating

Expert Guides

  • What is Spray Foam Insulation?
  • How Much Does Spray Foam Cost?
  • Our Chemicals & Technical Data
  • Customer Reviews (5.0 ★)
  • View Our Projects
  • Book Free On-Site Inspection

Areas We Serve

  • •Toronto & Central GTA
  • •Mississauga & Peel
  • •Oakville & Halton
  • •Vaughan & York Region
  • •Barrie & Simcoe County
  • •Muskoka & Cottage Country
  • •Waterloo & Tri-Cities
  • •Oshawa & Durham Region
  • + View All 50+ Cities
All project estimates, pricing illustrations, R-value metrics, and building code references on this website are for general informational purposes only and do not constitute a certified estimate or binding offer to contract. Formal written contracts provided by Sprayfoam Solutions Toronto Inc. following an on-site inspection strictly supersede all online representations. Subject to our Terms of Service and Privacy Policy.
AboutView Our WorkCustomer Reviews 5.0 ★CertificationsServicesAreas We ServeBlogContact UsTerms of ServicePrivacy Policy
© 2026 Spray Foam Solutions Toronto Inc. All Rights Reserved.