Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home

Residential

Major Projects
  • Custom New Homes
  • Additions & Renovations
  • Muskoka Cottages & Homes
  • Exterior Walls
  • Interior Ceiling Sound Dampening
Targeted Areas
  • Basements
  • Attics & Roof Decks
  • Crawl Spaces
  • Rim Joist Headers
  • Garages & Floors Over Garage
  • Cathedral Ceilings
  • Cantilevers & Overhangs
  • Under-Slab & Radiant Floors
  • Cold Rooms
  • RVs & Vans
  • Swimming Pools

Commercial

Buildings & Facilities
  • Commercial SPF & Fire Coating
  • Warehouse & Industrial
  • Metal Buildings
  • Barns & Agricultural
  • Multi-Unit Buildings
  • Flat Roof Systems
Specialty
  • Shipping Containers
  • Silos & Water Tanks

Code & Expert Guides

  • What is Spray Foam?
  • Cost of Spray Foam
  • Our Sprayfoam Chemicals
  • Certifications & Standards
  • Spray Foam Knowledge Base
Ontario Code & ULC Guides
  • Ontario R-Value & Code Guide
  • CAN/ULC-S705.2 Code Rules
  • Open-Cell vs. Closed-Cell

Thermal Barriers (Foam)

Core Systems
  • DC315 Intumescent Coating
  • Sprayfoam & Fire Coating (2-in-1)
Where Code Requires It
  • Mechanical & Furnace Rooms
  • Exposed Basements & Crawls
  • Attached Garage Ceilings
  • Warehouse Exposed Foam Decks
  • Unvented Attics & Roof Decks
  • Rim Joists & Floor Headers

Structural Fireproofing

Fireproofing Systems
  • Cementitious Fireproofing (SFRM)
  • Intumescent Fire Coating (Thin-Film)
Structural Assemblies
  • Structural Beams & Columns
  • Metal Floor & Roof Decks
  • Commercial Parkades & Garages
  • Architectural Exposed Steel (AESS)
  • Request Fire Spec & Quote

Code & Expert Guides

  • What is DC315 Fire Coating?
  • Cost of DC315 Fire Coating
  • Our Fire Coating Chemicals
  • Certifications & Standards
  • Fire Coating Knowledge Base
Ontario Code & ULC Guides
  • Ontario 15-Min Thermal Barrier
  • ULC 1–4 Hr Steel Ratings
  • DC315 vs. Type X Drywall
Locations
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviews
Contact UsGet My Pricing
Serving GTA & Beyond
Sprayfoam SolutionsWe Serve GTA & Across Ontario!
Home
Spray Foam Services
Overview & Guides
What is Spray Foam?Cost of Spray FoamOpen-Cell vs. Closed-CellOntario R-Value & Code Guide
Project Applications
Custom New HomesAdditions & RenovationsMuskoka Cottages & HomesExterior WallsInterior Ceiling Sound DampeningBasementsAttics & Roof DecksCrawl SpacesRim Joist HeadersGarages & Floors Over GarageCathedral CeilingsCantilevers & OverhangsUnder-Slab & Radiant FloorsCold RoomsRVs & VansSwimming Pools
Overview & Guides
Commercial SPF & Fire Coating OverviewCAN/ULC-S705.2 Code RulesCost of Spray Foam
Project Applications
Warehouse & IndustrialMetal BuildingsBarns & AgriculturalMulti-Unit BuildingsFlat Roof SystemsShipping ContainersSilos & Water Tanks
Overview & Guides
Our Sprayfoam ChemicalsCertifications & StandardsSpray Foam Knowledge Base
Fire Coatings
Overview & Guides
DC315 Fire Coating OverviewSprayfoam & DC315 Package (2-in-1)What is DC315 Fire Coating?Cost of DC315 Fire CoatingDC315 vs. Type X DrywallOntario 15-Min Thermal Barrier
Project Applications
Mechanical & Furnace RoomsExposed Basements & CrawlsAttached Garage CeilingsWarehouse Exposed Foam DecksUnvented Attics & Roof DecksRim Joists & Floor Headers
Overview & Guides
Intumescent Fire Coating OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Structural Beams & ColumnsArchitectural Exposed Steel (AESS)Request Fire Spec & Quote
Overview & Guides
Cementitious Fireproofing OverviewULC 1–4 Hr Steel Fire Ratings
Project Applications
Metal Floor & Roof DecksCommercial Parkades & GaragesRequest Fire Spec & Quote
Overview & Guides
Our Fire Coating ChemicalsCertifications & StandardsFire Coating Knowledge Base
Ontario Service RegionsView All 50+ Cities →
Toronto & Central
Toronto · Etobicoke · North York · Scarborough
Peel Region
Mississauga · Brampton · Caledon
York Region
Vaughan · Markham · Richmond Hill · Newmarket
Halton Region
Oakville · Burlington · Milton · Halton Hills
Durham Region
Pickering · Whitby · Oshawa · Ajax · Clarington
Hamilton & Niagara
Hamilton · St. Catharines · Niagara Falls · Brantford
Kitchener / Waterloo / Guelph
Kitchener · Waterloo · Cambridge · Guelph
Barrie & Simcoe County
Barrie · Orillia · Innisfil · Collingwood
Muskoka & Cottage Country
Muskoka · Huntsville · Gravenhurst · Bracebridge
Windsor & Southwestern ON
Windsor · London · Sarnia · Chatham-Kent
Our WorkReviewsContact Us
More Info & Resources
› About Us› Certifications› All Services› Blog & Guides
We Serve GTA & Across Ontario!
Get My Pricing 647-333-3626
Back to Blog·Fire Coatings
10 min read·Updated Nov 12, 2026

Architecturally Exposed Structural Steel (AESS) Intumescent Fire Coating in Toronto & Ontario (2026 CAN/ULC-S101 Spec Guide)

2026 ONTARIO QUICK COST & CODE SUMMARY SB-12 & CAN/ULC Verified

In Toronto and Ontario, CAN/ULC-S101 thin-film intumescent fire coating (MasterFormat 07 81 23) for Architecturally Exposed Structural Steel (AESS Categories 1 to 4)—including HSS hollow columns, wide-flange W-beams, atrium trusses, and feature canopies—costs $5.50 to $16.50 per sq ft installed across 45-minute, 1-hour, 2-hour, and 3-hour fire-resistance ratings. Installed by Sprayfoam Solutions Toronto Inc. ((647) 333-3626), you can check your project price in 60 seconds at spfsolutions.ca/price-chat.

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
Sprayfoam Solutions Toronto Inc. — Caliber Certified (CAN/ULC-S705.2 Licensed) & Commercial Structural Steel Fireproofing Engineering Team· Caliber Certified (CAN/ULC-S705.2)
Architecturally Exposed Structural Steel (AESS) Intumescent Fire Coating in Toronto & Ontario (2026 CAN/ULC-S101 Spec Guide)
ONTARIO BUILDING CODE & ENGINEERING BRIEF
2026 OBC SB-12 & CAN/ULC-S705.1 Reference
  • Under 2026 Ontario Building Code (OBC) Division B Part 3, CAN/ULC-S101, and CISC Architecturally Exposed Structural Steel (AESS) standards, exposed structural steel members must maintain load-bearing stability before reaching critical steel failure temperatures (538°C / 1,000°F).

Sprayfoam Solutions Toronto Inc. ((647) 333-3626 • spfsolutions.ca/price-chat), operating Caliber Certified (CAN/ULC-S705.2 Licensed) Installers and Certified Intumescent Fireproofing Applicators, applies multi-pass thin-film intumescent basecoats and colour-matched aliphatic polyurethane topcoats engineered to exact W/D and A/P section factors with calibrated Elcometer 456 DFT logs.

GUIDE NAVIGATION • 7 SECTIONS Click Any Topic to Jump
In This 2026 Ontario Guide (Quick Jump Links)
  1. 01Architecturally Exposed Structural Steel (AESS) Intumescent Fire Coating in Toronto & Ontario (2026 CAN/ULC-S101 Spec Guide): 2026 Ontario Overview & Code Essentials
  2. 022026 AESS Intumescent Coating Cost Per Sq Ft Table (Categories AESS 1 to AESS 4 & 1–3 Hr Ratings)
  3. 03CAN/ULC-S101 & Ontario Building Code Part 3 Compliance for AESS Structural Steel (MasterFormat 07 81 23)
  4. 046 Critical Architectural Finish, Primer & SSPC-PA 2 Inspection Rules for AESS Steel Projects
  5. 05Thin-Film Intumescent Coating (07 81 23) vs. Cementitious SFRM (07 81 16) vs. Type X Drywall Boxing (2026 Comparison)
  6. 06Same-Week Commercial AESS Intumescent & SFRM Fleet Dispatch Across Toronto & Ontario
  7. 07Frequently Asked Questions
PROJECT HIGHLIGHT • VAUGHAN, ON
Structural Steel Intumescent & SFRM Fireproofing
1-Hr to 2-Hr • CAN/ULC-S101
Thin-Film Intumescent & Cementitious SFRM (MasterFormat 07 81 00)
  • 12,000 sq ft W-Beams, HSS Columns & Fluted Decking
  • CAN/ULC-S101 Listed Designs (F900 / D900 / Z600)
  • Full DFT / ASTM E605 QA Verification Package
VERIFIED GOOGLE REVIEW • 5.0 ★★★★★ (56+)
NK
Nikola
Verified Google Customer • Sprayfoam Solutions Toronto

“Professional service from start to finish. Fair pricing, great communication, and the installers did a super clean job. Highly recommend Sprayfoam Solutions Toronto.”

  • 5.0 ★ Rating Across 56+ Verified Google Reviews

Architecturally Exposed Structural Steel (AESS) Intumescent Fire Coating in Toronto & Ontario (2026 CAN/ULC-S101 Spec Guide): 2026 Ontario Overview & Code Essentials

Modern commercial lobbies, transit stations, airport concourses, university atriums, luxury retail flagship stores, and glass-walled office towers across Toronto, Mississauga, Vaughan, Ottawa, and Hamilton rely on Architecturally Exposed Structural Steel (AESS) as their primary visual signature. Yet under 2026 Ontario Building Code (OBC) Division B Part 3, structural steel columns, diagrids, wide-flange beams, and tubular space trusses cannot be left unprotected when the building occupancy requires a 45-minute, 1-hour, 2-hour, or 3-hour fire-resistance rating (CAN/ULC-S101). Because rough cementitious spray-applied fire-resistive material (SFRM) or boxy drywall framing destroys the sleek geometry of exposed steel, architects specify precision thin-film intumescent fire coating (CSI MasterFormat Section 07 81 23).

At Sprayfoam Solutions Toronto Inc., we serve Ontario general contractors, structural steel fabricators, and commercial developers as a Single-Source Certified Spray Foam & Fire Coating Contractor operating Caliber Certified (CAN/ULC-S705.2 Licensed) Installers and manufacturer-certified commercial intumescent and cementitious fireproofing crews. Whether your project requires a Level 3/4 smooth sanded architectural finish on pedestrian-level HSS columns (AESS 3 / AESS 4), a high-build 2-hour rating on high-bay roof trusses (AESS 1 / AESS 2), or a turnkey 2 lb spray foam + 18-mil IFTI DC315 thermal barrier package on adjacent envelope walls, we execute the entire scope under one unified schedule. Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (spfsolutions.ca/price-chat) • No Site Visit Required, or send your steel schedule to our General Contractor & B2B Estimating Desk.

2026 AESS Structural Steel Intumescent Fire Coating Cost by Category & Rating (Ontario)

Compare our 3 commercial B2B pricing tiers across CISC AESS Categories 1–4 and CAN/ULC-S101 hourly ratings before checking your instant estimate in 60 seconds:

AESS 1 & AESS 2 • High-Bay Trusses & Beams (>6m View)
45-Min to 1-Hour CAN/ULC-S101 Rating
$5.50 – $8.75 / sq ft
25 – 55 Mils DFT (W/D Dependent)
  • Standard Airless Spray Finish for Ceilings, Canopies & Joists Viewed >20 ft Away
  • Full Elcometer 456 DFT Log & ULC Design Binder
  • Includes $250 Credit
Get My Price in 60s
Most Popular • AESS 3 Close-View Columns & Lobbies (≤6m)
1-Hour to 2-Hour CAN/ULC-S101 Rating
$8.25 – $13.50 / sq ft
45 – 115 Mils DFT + Urethane Topcoat
  • Multi-Pass Fine-Finish Airless + Inter-Coat Sanding ("Orange-Peel-Free" Architectural Grade) + Colour-Matched Aliphatic Polyurethane Topcoat
Get My Price in 60s
AESS 4 Showcase Steel / 2-Hr to 3-Hr Heavy HSS Columns
2-Hour to 3-Hour CAN/ULC-S101 / Exterior C3–C5
$11.50 – $16.50+ / sq ft
90 – 180+ Mils DFT / Epoxy Intumescent
  • Ultra-Smooth Skimmed & Sanded Automotive-Style Finish or Weather-Resistant Epoxy/Solvent Intumescent System
  • Priority GC Tender Pricing
Get My Price in 60s

2026 AESS Intumescent Coating Cost Per Sq Ft Table (Categories AESS 1 to AESS 4 & 1–3 Hr Ratings)

In 2026, thin-film intumescent exposed steel fireproofing in Ontario ranges from $5.50 to $16.50+ per square foot of steel surface area. Unlike basic wall paint, the installed cost of a CAN/ULC-S101 structural steel intumescent system is governed by two engineering matrices: the required Dry Film Thickness (DFT in mils) dictated by each steel member’s Section Factor (W/D or A/P ratio), and the CISC Architecturally Exposed Structural Steel (AESS 1 through AESS 4) surface smoothness and topcoat specification:

Swipe table horizontally on mobile to compare all columns
CISC AESS Category & Viewing DistanceTarget CAN/ULC-S101 Fire RatingTypical DFT Mils (W/D = 0.80 to 1.60)2026 Installed Rate (/sq ft)Finish Standard & Topcoat Spec
AESS 1 — Basic Exposed Steel(High-Bay Roof Joists, Utility Trusses >6m)
45-Min to 1-Hour (ULC Design Z600 / D900)
22 – 55 Mils DFT (32–80 Mils WFT)
$5.50 – $7.95 / sq ft
Uniform spray texture; optional sealer topcoat
AESS 2 — Feature Steel (>6m / 20ft View)(Atrium Ceilings, Upper Diagrid Beams)
1-Hour to 2-Hour (ULC Design F900 / Z600)
40 – 95 Mils DFT (60–135 Mils WFT)
$7.25 – $10.75 / sq ft
Controlled multi-pass spray + Satin Urethane Topcoat
AESS 3 — Close-Range Feature Steel (≤6m)(Pedestrian Columns, Stair Stringers)
1-Hour to 2-Hour (HSS & W-Columns)
45 – 120 Mils DFT + Inter-Coat Sanding
$8.95 – $13.50 / sq ft
Smooth rolled/sanded finish + RAL/Benjamin Moore Topcoat
AESS 4 — Showcase / Sculptural Steel(Reception Feature Nodes, Custom Touch Zones)
1-Hour to 2-Hour (High-Visibility Architectural)
45 – 115 Mils DFT + Full Skim/Sand Prep
$11.50 – $15.75 / sq ft
Near-zero texture, filled weld seams & high-durability topcoat
3-Hour Heavy Transfer Steel / Exterior Canopies(High-Load or Semi-Exposed C3/C4)
2-Hour to 3-Hour (Solvent / Epoxy Intumescent)
110 – 195+ Mils DFT (Multi-Day Build)
$12.50 – $16.50+ / sq ft
High-durability exterior/humid aliphatic polyurethane shield
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

HSS Hollow Structural Sections (Round & Square Columns) vs. Wide-Flange W-Beams: Why Section Factor (W/D & A/P) Controls Mil Thickness

When general contractors request a lump-sum bid for structural steel fire rating in Ontario, our engineering estimators never guess a flat mil thickness across all steel. Under CAN/ULC-S101 and CCMC / NRC fire-resistance evaluation protocols, every steel profile heats up at a rate proportional to its Weight-to-Heated-Perimeter ratio (W/D for wide-flange shapes) or Area-to-Perimeter ratio (A/P or Hp/A for Hollow Structural Sections HSS):

  • 1. Thin-Wall HSS Hollow Columns Require Significantly Higher DFT Mils Than Heavy W-Columns: A slender HSS 152×152×6.4 square column or HSS 219×8.0 round pipe column has a small thermal mass relative to its exposed 4-sided surface area (low A/P ratio), meaning it reaches the 538°C critical buckling temperature rapidly during a furnace test. Achieving a 2-hour rating on a thin-wall HSS column may require 110 to 165 mils DFT (3 to 5 passes), whereas a heavy W360×196 wide-flange column (high W/D ratio) may achieve the exact same 2-hour rating at only 50 to 70 mils DFT.
  • 2. 3-Sided Composite Beams (Supporting Concrete on Metal Deck) vs. 4-Sided Exposed Beams: Wide-flange floor beams whose top flange is embedded against a concrete-on-fluted-steel floor deck are fire-exposed on only 3 sides and benefit from the heat-sink effect of the concrete slab (Restrained Beam Design). Standalone atrium tie-beams or canopy purlins exposed on all 4 sides (Unrestrained) require higher intumescent film builds.
  • 3. Aliphatic Polyurethane Topcoat Colour Matching (RAL, Pantone & Benjamin Moore): Raw intumescent basecoats dry to a flat matte white. For AESS 2, AESS 3, and AESS 4 members, our crew applies a manufacturer-approved 2.0 to 4.0 mil DFT aliphatic polyurethane or acrylic urethane topcoat custom-tinted to any RAL, Sherwin-Williams, or Benjamin Moore architectural colour (Jet Black, Anodized Bronze, Gunmetal Grey, or Pure White) in Matte, Satin, or Semi-Gloss sheen.
Clear Sansin Firestop 99 intumescent fire coating applied to high-quality pressurized mass timber glulam beams and ceilings in Oshawa & Clarington [JOB-2026-07-24-01]
Exposed wood & mass timber code compliance in Oshawa & Clarington: Sansin Firestop 99 clear intumescent fire coating over high-quality pressurized timber framing to achieve certified interior fire-retardant protection without opaque paint [JOB-2026-07-24-01].

CAN/ULC-S101 & Ontario Building Code Part 3 Compliance for AESS Structural Steel (MasterFormat 07 81 23)

Under 2026 Ontario Building Code Division B Part 3 (Fire Protection, Occupant Safety and Accessibility), primary load-bearing frames, floor assemblies, mezzanines, and roof structures supporting occupancy loads must achieve a tested 45-minute, 1-hour, 1.5-hour, 2-hour, or 3-hour fire-resistance rating in accordance with CAN/ULC-S101 (Standard Methods of Fire Endurance Tests of Building Construction and Materials). When exposed to fire (>200°C), a thin-film intumescent coating undergoes a thermo-chemical reaction—expanding 30 to 50 times its original dry thickness (40 mils expands to nearly 2 inches of microporous carbonaceous char) to keep the steel core below 538°C (1,000°F).

CSI MASTERFORMAT 07 81 23 • AESS INTUMESCENT ENGINEERING SPEC SHEET 2026 Ontario Building Code Verified
2026 CAN/ULC-S101 Structural Steel Intumescent & Hybrid Fireproofing Specifications
01Fire-Resistance Standard
CAN/ULC-S101 / ASTM E119 / UL 263 — 45-Min, 1-Hr, 1.5-Hr, 2-Hr & 3-Hr Ratings (ULC Design Series F900, D900, Z600, O600)
02Approved Structural Fireproofing
Isolatek Cafco® 300, GCP Monokote® MK-6® / Z-106, Carboline Pyrocrete® / Nullifire® SC902, Sherwin-Williams Firetex® & other ULC-listed structural fireproofing systems
03Approved Thermal Barrier Coatings
IFTI DC315® (CCMC #14036-R), No-Burn® Plus ThB, Flame Control No. 60-60A & other approved CAN/ULC-S124 thermal barrier coatings (for adjacent SPF envelopes)
04Compatible Envelope Spray Foams
BASF Walltite® Eco v.3, Huntsman Building Solutions (Icynene/Demilec), Johns Manville & other approved CCMC spray foam chemicals (CAN/ULC-S705.1)
05Steel Prep & Primer Standard
SSPC-SP6 / NACE No. 3 Commercial Blast Cleaning + Tested Zinc-Rich, Phenolic Alkyd, or Two-Part Epoxy Shop Primer (2.0–4.0 Mils DFT)
06QA & DFT Verification
SSPC-PA 2 Calibrated Magnetic/Electromagnetic Digital Gauge (Elcometer 456) — Logged per member ID with primer subtraction
TECHNICAL SPECS • 3 COMMERCIAL AESS & HYBRID STEEL FIREPROOFING SYSTEMS
Inside Our 3-Layer AESS Structural Steel Intumescent System
SYSTEM / COATING TYPE
Tested Steel Primer(SSPC-SP6 + Epoxy / Alkyd)

Verified primer compatibility & adhesion pull-test.

REQUIRED THICKNESS
2.0 – 4.0 Mils DFT(Baseline Primer Reading Logged)

Solvent-wiped, degreased & baseline-measured before basecoat.

CODE & FIRE PERFORMANCE
100% Char Bond(ULC Primer Matrix Match)

Prevents intumescent char fall-off during fire expansion.

APPLICATION RATIONALE

The #1 cause of intumescent fireproofing failure on structural steel is spraying over an unapproved or overly thick (>5 mil) shop primer that softens at 150°C and drops the expanding intumescent char off the beam. We verify your steel fabricator’s primer data sheet against the ULC listing and log baseline primer DFT on every member before spraying.

CONCRETE FOUNDATION WALL1/2" DRYWALL (THERMAL BARRIER)SSPC-SP6 & ULC PRIMER VERIFICATIONBASELINE DFT LOGGED PER STEEL MEMBERFREEZING DAMP SOILWARM & COZY BASEMENT
SYSTEM / COATING TYPE
Thin-Film Intumescent(Water-Borne, Solvent or Hybrid)

Precision airless build matched to W/D & A/P ratios.

REQUIRED THICKNESS
25 – 150+ Mils DFT(35 – 45 Mils WFT Per Lift)

Applied via 3,300+ PSI airless rig with inter-coat sanding.

CODE & FIRE PERFORMANCE
45-Min to 3-Hr FRR(CAN/ULC-S101 Certified)

Expands 30x–50x at 200°C to shield steel below 538°C.

APPLICATION RATIONALE

Our certified applicators apply high-solids water-borne (interior conditioned) or fast-cure solvent/hybrid intumescent coatings (Nullifire SC902, Firetex, ADFI SprayFilm) in controlled multi-pass lifts. For AESS 3 and AESS 4 columns within reach of occupants, we sand high-build passes smooth between coats.

CONCRETE FOUNDATION WALL1/2" DRYWALL (THERMAL BARRIER)CAN/ULC-S101 INTUMESCENT BASECOAT1-HR TO 3-HR STRUCTURAL FIRE RATINGFREEZING DAMP SOILWARM & COZY BASEMENT
SYSTEM / COATING TYPE
Polyurethane Topcoat(CISC AESS 2–4 Architectural Finish)

Moisture, UV & abrasion shield in custom RAL colours.

REQUIRED THICKNESS
2.0 – 4.0 Mils DFT(Matte, Satin or Semi-Gloss)

Seals hygroscopic basecoat against humidity & cleaning.

CODE & FIRE PERFORMANCE
C1 to C4 Durability(Interior & Semi-Exposed)

Delivers a sleek painted-steel architectural appearance.

APPLICATION RATIONALE

Once third-party or in-house SSPC-PA 2 Elcometer DFT inspections confirm that every column and beam meets its exact ULC dry film thickness, we apply a two-component aliphatic polyurethane topcoat—locking out environmental moisture and delivering a flawless architectural finish.

CONCRETE FOUNDATION WALL1/2" DRYWALL (THERMAL BARRIER)ALIPHATIC POLYURETHANE TOPCOATCUSTOM RAL / BENJAMIN MOORE COLOUR MATCHFREEZING DAMP SOILWARM & COZY BASEMENT

THE SPRAY FOAM EXPERTS

That Actually Lower Your Energy Bills
★★★★★5.0 Google Rating•55+ Verified Reviews•Serving Across Ontario
STEP 1: 60-SECOND PRICE CHECK
LOCK IN DIRECT CONTRACTOR PRICING

Fast Response & Quotes · No Commitment!

Tap to Select Your Project:
or call directly: 647-333-3626
VERIFIED, CERTIFIED & LISTED ON
Google5.0 ★ Verified
HomeStarsVerified Pro
Houzz ProListed Contractor
TrustedProsCanadian Directory
Caliber CertifiedCAN/ULC-S705.2
WSIB & CCMCOntario Cleared

6 Critical Architectural Finish, Primer & SSPC-PA 2 Inspection Rules for AESS Steel Projects

Delivering a true CISC AESS 3 or AESS 4 finish that simultaneously satisfies both the project architect’s visual aesthetic and the independent testing engineer’s SSPC-PA 2 thickness audit requires strict field discipline. Here are the 6 critical trade rules our commercial fireproofing division enforces across Toronto and Ontario:

  • 1. Audit Shop Primer Compatibility & Thickness (2.0–4.0 Mils DFT) Before Steel Leaves the Fabricator: Never allow a structural steel fabricator to apply generic alkyd shop primer without checking the intumescent manufacturer’s ULC-listed Primer Compatibility Table. Furthermore, baseline shop primer thickness must be measured and recorded before intumescent spraying so the third-party inspector can subtract primer mils from total magnetic Elcometer readings.
  • 2. Mask Bolted Splice Plates, Turnbuckles & Architecturally Chamfered Edges With Precision: On AESS 3 and AESS 4 trusses and diagrids, heavy paint bridging across bolt heads or clevis pins ruins the architectural detailing. We use high-pressure direct-to-metal airless tips (0.019"–0.025"), back-rolling, and inter-coat sanding (120–180 grit) to keep flange toes, weld fillets, and bolted connections crisp.
  • 3. Choose Solvent-Borne or Hybrid Fast-Track Intumescents (Nullifire SC902 / Firetex) for Unheated Winter Envelopes: Standard water-borne acrylic intumescent coatings require ≥10°C (50°F), <65%–75% RH, and a fully weathered-in building envelope. When general contractors need to fireproof AESS steel during an Ontario winter before curtain-wall glazing is complete, we specify fast-cure hybrid or solvent-borne systems that resist early condensation and build higher mils per coat.
  • 4. Respect Inter-Coat Cure Windows to Prevent Solvent/Moisture Blistering & Cracking: Applying a second 45-mil WFT pass of intumescent basecoat—or sealing the assembly with a two-part polyurethane topcoat—before the underlying pass has fully released its carrier moisture or solvent causes catastrophic mud-cracking and blistering. We verify shore hardness and thumb-twist cure before each subsequent coat.
  • 5. Value-Engineer Concealed Ceiling Steel With Cementitious SFRM (07 81 16) to Save 50%–65%: As detailed in our Intumescent vs. Cementitious Fireproofing Cost Comparison, there is no reason to pay $9.50/sq ft for architectural intumescent paint on steel beams hidden above a drop-tile ceiling. Because we install both cementitious fireproofing (Isolatek Cafco 300, GCP Monokote MK-6 / Z-106) and thin-film intumescents, we value-engineer hidden zones with SFRM ($2.25–$4.85/sq ft) and reserve intumescent coating strictly for exposed AESS members.
  • 6. Coordinate SSPC-PA 2 Digital DFT Sign-Off Before Applying the Colored Polyurethane Topcoat: Under SSPC-PA 2 inspection standards, independent engineering firms verify dry film thickness of the intumescent basecoat prior to topcoating. We log digital Elcometer 456 spot and bay averages across every column face (flanges and webs) and obtain engineer sign-off before spraying the final colored topcoat.
Clear Sansin Firestop 99 intumescent fire coating applied to high-quality pressurized mass timber walls and ceilings in Milton & Halton Hills (Georgetown) [JOB-2026-07-24-01]
Low-VOC clear intumescent finish in Milton & Halton Hills (Georgetown): High-quality pressurized timber ceiling and wall panels protected with clear, see-through Sansin Firestop 99 intumescent fire coating for Architecturally Exposed Structural Steel [JOB-2026-07-24-01].

Thin-Film Intumescent Coating (07 81 23) vs. Cementitious SFRM (07 81 16) vs. Type X Drywall Boxing (2026 Comparison)

How does CAN/ULC-S101 Thin-Film Intumescent Fire Coating compare against traditional Cementitious Spray-Applied Fire-Resistive Material (SFRM) and Multi-Layer 5/8" Type X Gypsum Board Column Boxing in 2026? Here is the side-by-side commercial engineering breakdown:

Swipe table horizontally on mobile to compare all columns
Engineering & Commercial MetricThin-Film Intumescent Coating (07 81 23)Cementitious SFRM (Monokote MK-6 / Cafco 300)2–3 Layers of 5/8" Type X Drywall Boxing
2026 Installed Cost(/sq ft)
$5.50 – $16.50 / sq ft(AESS 1 to AESS 4)
$2.25 – $5.50 / sq ft(Lowest Cost for Hidden Steel)
$8.50 – $15.50 / sq ft(Studs + Board + Tape + Paint)
Architectural Appearance
Sleek Painted Steel Profile(Preserves HSS & W-Shapes)
Rough, bumpy gray/tan fibrous plaster texture
Bulky square drywall column box(hides steel completely)
Thickness for 1-Hr to 2-Hr Rating
0.030" to 0.120" (30–120 Mils DFT)(Paper-Thin)
0.75" to 2.25" Thick (19 mm to 57 mm buildup)
2.5" to 4.5" Per Side(Steals valuable floor/parking space)
Impact & Abrasion Resistance
High(Hard shell + Aliphatic Polyurethane Topcoat)
Low on 15 lb SFRM(Requires 22–40 lb Z-106 in traffic zones)
Paper face dents & cracks easily in lobbies/corridors
Cleanliness & Dust in Occupied Spaces
Zero Dust Shedding — Hospital, Retail & Office Safe
Sheds mineral fibres if left exposed in occupied zones
Creates heavy drywall sanding dust during construction
Ideal Commercial Application
Exposed Lobbies, Atriums, Canopies, Retail & Lofts
Concealed Beams Above Drop Ceilings & Parkade Decks
Residential Partition Walls & Non-AESS Shaft Enclosures
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
3.5" (R22) of 2lb closed-cell spray foam across exterior 2x6 wood stud cavities in Newmarket & Aurora [JOB-2025-04-14-01]
Above-grade exterior wall envelope in Newmarket & Aurora: 3.5" (R22) of CAN/ULC-S705.1 2lb closed-cell spray foam across exterior 2x6 wood stud cavities (~$1,530–$1,950 installed per 450 sq ft wall section) — delivering a seamless air and Class 1 vapour barrier [JOB-2025-04-14-01].
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds (/price-chat) • No Site Visit Required
Get My Price in 60s

Bidding a MasterFormat 07 81 23 thin-film intumescent package or need fast-track CAN/ULC-S101 fireproofing on exposed steel columns and beams? Check your instant ballpark estimate in 60 seconds at spfsolutions.ca/price-chat, claim your $250 Estimate Credit, or call our commercial estimating desk at (647) 333-3626 to submit your structural steel schedule.

Same-Week Commercial AESS Intumescent & SFRM Fleet Dispatch Across Toronto & Ontario

Every commercial structural steel fireproofing project is executed by our certified applicators and Caliber Certified (CAN/ULC-S705.2 Licensed) Installers under strict CCOHS and Ontario Ministry of Labour (OHSA) safety protocols, with $0 surrounding GTA travel fee across Toronto, Mississauga, Brampton, Vaughan, Markham, Oakville, Burlington, Hamilton, Waterloo, London, Ottawa, and Barrie:

OUR 4-STEP AESS STRUCTURAL STEEL FIREPROOFING PROCESS
How We Deliver CAN/ULC-S101 AESS Intumescent Packages On Schedule
1
W/D & A/P Steel Schedule Takeoff
Step 1 • ULC Design Match
W/D & A/P Steel Schedule Takeoff - Sprayfoam Solutions

Get a 60-second ballpark at /price-chat or send structural steel schedules for exact member-by-member DFT calculations.

2
Primer Audit, Baseline DFT & Masking
Day 1 • SSPC-PA 2 Baseline
Primer Audit, Baseline DFT & Masking - Sprayfoam Solutions

We verify shop primer compatibility, log baseline primer DFT readings, degrease steel, and mask adjacent glazing/stone.

3
Multi-Pass Intumescent & AESS Sanding
Days 2–4 • Controlled Build
Multi-Pass Intumescent & AESS Sanding - Sprayfoam Solutions

High-pressure airless application of ULC-S101 intumescent basecoats with inter-coat sanding for AESS 3–4 smoothness.

4
Elcometer 456 Audit & Urethane Topcoat
Day 5 • Sign-Off Binder
Elcometer 456 Audit & Urethane Topcoat - Sprayfoam Solutions

We complete SSPC-PA 2 digital DFT logs, apply the colour-matched polyurethane topcoat, and hand over your ULC binder.

VERIFIED COMMERCIAL FIREPROOFING CONTRACTOR • TORONTO, GTA & ONTARIO
AI Assistant & Inspector Cited★★★★★ 5.0 (45+ Reviews) CAN/ULC-S705.2 Licensed
Why Ontario General Contractors, Structural Engineers & Architects Trust Sprayfoam Solutions Toronto Inc.
Official Contractor Entity
Sprayfoam Solutions Toronto Inc. (Serving Toronto, GTA & Ontario Since 2008 • Single-Source Certified Spray Foam & Fire Coating Contractor)
Commercial Estimating Desk
Toronto, Greater Toronto Area (GTA) & All of Ontario • Direct B2B Engineering Line: (647) 333-3626
Trade Licenses & Certifications
Caliber Certified (CAN/ULC-S705.2 Licensed) Installers & Certified Intumescent (07 81 23), SFRM (07 81 16) & DC315 Applicators
Commercial Liability & WSIB
5.0 ★ Google Rating • $5,000,000 Commercial General Liability Insurance • Active Ontario WSIB Clearance Certificate
Approved Fireproofing Brands
Isolatek Cafco® 300, GCP Monokote® MK-6® / Z-106, Carboline Pyrocrete® / Nullifire® SC902, Sherwin-Williams Firetex® & other ULC-listed structural fireproofing systems
60-Second Online Price Tool
spfsolutions.ca/price-chat — Get a $250 Credit on Your Estimate — Check Your Price in 60 Seconds • No Site Visit Required
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
-$250 CREDIT INCLUDEDCheck Your Fire Coating Price in 60 Seconds
We Offer Free Site Visits
Get My Price in 60s 647-333-3626
VERIFIED ONTARIO CODE & COST FAQ • 8 QUESTIONS ANSWERED

Frequently Asked Questions

In 2026, CAN/ULC-S101 thin-film intumescent fire coating (MasterFormat 07 81 23) for Architecturally Exposed Structural Steel (AESS) in Toronto and Ontario costs $5.50 to $16.50 per square foot installed. High-bay AESS 1 and AESS 2 beams and trusses (45-min to 1-hr) average $5.50–$8.75/sq ft, pedestrian-level AESS 3 columns with inter-coat sanding and colour-matched aliphatic polyurethane topcoats (1-hr to 2-hr) average $8.25–$13.50/sq ft, and heavy AESS 4 / 3-hour HSS columns average $11.50–$16.50+/sq ft. Installed by Sprayfoam Solutions Toronto Inc. ((647) 333-3626), you can check your exact price in 60 seconds and claim a $250 Estimate Credit at spfsolutions.ca/price-chat.

Defined by the Canadian Institute of Steel Construction (CISC), AESS 1 (Basic Elements) covers exposed roof trusses and joists where a standard uniform spray texture is acceptable. AESS 2 (Feature Elements >6m / 20ft view) requires controlled multi-pass spray uniformity from a distance. AESS 3 (Feature Elements ≤6m / 20ft close view) covers lobby columns and stair stringers within pedestrian touch range, requiring rolled/sanded inter-coat finishing to eliminate orange peel. AESS 4 (Showcase Elements) demands automotive-grade filled and sanded smoothness.

Under CAN/ULC-S101 fire-endurance physics, the required intumescent Dry Film Thickness (DFT) depends on the steel member’s Section Factor (W/D or A/P ratio)—which measures steel mass relative to fire-exposed perimeter. Because thin-wall HSS square and round columns have less steel mass per square foot of exposed surface area (low A/P ratio), they heat up toward the 538°C structural failure threshold faster than heavy wide-flange columns, requiring higher DFT mils for a 1-hour or 2-hour rating.

As a Single-Source Certified Spray Foam & Fire Coating Contractor, Sprayfoam Solutions Toronto Inc. ((647) 333-3626 • spfsolutions.ca/price-chat) installs full ULC and CCMC listed systems: Isolatek Cafco® 300, GCP Monokote® MK-6® / Z-106, Carboline Pyrocrete® / Nullifire® SC902, Sherwin-Williams Firetex® & other ULC-listed structural fireproofing systems (including ADFI SprayFilm / A/D Firefilm III); IFTI DC315® (CCMC #14036-R), No-Burn® Plus ThB, Flame Control No. 60-60A & other approved CAN/ULC-S124 thermal barrier coatings; and BASF Walltite® Eco v.3, Huntsman Building Solutions (Icynene/Demilec), Johns Manville & other approved CCMC spray foam chemicals.

Yes. While the intumescent basecoat cures to a flat white finish, our crew applies a ULC-approved 2.0 to 4.0 mil DFT aliphatic polyurethane or acrylic urethane protective topcoat factory-tinted to any RAL, Pantone, Sherwin-Williams, or Benjamin Moore colour—including Architect Jet Black, Charcoal, Anodized Bronze, Metallic Silver, or Pure White—in Matte, Satin, or Semi-Gloss finishes.

No—and confusing these two standards causes failed municipal inspections. IFTI DC315® (CAN/ULC-S124 / CCMC #14036-R) is a 15-minute thermal barrier engineered exclusively to protect spray polyurethane foam insulation. Structural steel columns, beams, and trusses require a dedicated CAN/ULC-S101 structural steel intumescent system (07 81 23) or cementitious SFRM (07 81 16) tested to keep steel below 538°C for 45 minutes to 3 hours.

Third-party materials-testing engineers audit structural steel intumescent coatings in accordance with SSPC-PA 2 (Procedure for Determining Conformance to Dry Coating Thickness Requirements) using calibrated electromagnetic digital gauges (Elcometer 456 or PosiTector 6000). Our crew logs baseline shop-primer mils before spraying, checks Wet Film Thickness (WFT) on every pass, and provides a member-by-member Net Intumescent DFT Log prior to topcoating.

General contractors, steel fabricators, and architects can check instant square-foot pricing and claim a $250 Estimate Credit in 60 seconds at spfsolutions.ca/price-chat (No Site Visit Required), upload structural steel schedules and architectural drawings via our General Contractor Portal, or call Sprayfoam Solutions Toronto Inc. directly at (647) 333-3626 for same-week commercial mobilization across Toronto, the GTA, and Ontario.

Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s
ONTARIO COMMERCIAL FIREPROOFING FLEET • $0 SURROUNDING GTA TRAVEL FEE Same-Week GTA & Ontario Dispatch
Explore Our Structural Steel Intumescent, SFRM & Turnkey Spray Foam Hubs Across Ontario

Select your Division 07 commercial fireproofing scope or local Ontario municipality below for 2026 B2B tender rates and same-week dispatch:

Our Spray Foam Insulation Services & Cost Guides
Intumescent Fire Coating (07 81 23)Cementitious Fireproofing (07 81 16)DC315 Thermal Barrier Fire CoatingTurnkey Spray Foam + Fire CoatingGeneral Contractor & Architect Bid Desk60-Second Commercial Price Calculator
Cities & Municipalities We Serve Across Toronto, the GTA & Ontario (20 Locations)
TorontoScarboroughMississaugaBramptonVaughanMarkhamOakvilleBurlingtonHamiltonPickeringAjaxWhitbyOshawaRichmond HillNewmarketMiltonBarrieAuroraUxbridgeSt. Catharines
Claim Your $250 Estimate Credit Today•We Offer Free Site Visits
Get My Price in 60s

Proudly Serving Toronto, GTA & All of Ontario

Direct contractor pricing · CAN/ULC-S101 & S124 Certified · $0 Travel Fee Across Ontario

Sprayfoam Solutions service coverage map across Toronto, GTA and Ontario
50+ Cities & Municipalities

With regional mobile crews stationed right near you, we charge $0 travel fees and stand as the best, most trusted contractor to serve your home or commercial building anywhere in Ontario.

WSIB Insured
6,500+ Projects Completed
Calculate Estimate →

Get Your Free Quote

Takes 10 seconds — we'll call you back.

Free Estimate No Obligation WSIB Cleared Licensed Caliber Certified
Call 647-333-3626 (7AM–9PM)

LEGAL NOTICE & TRADE DISCLAIMER

Sprayfoam Solutions Toronto Inc. • Ontario Building Code & CAN/ULC Editorial Reference

1. Informational & Marketing Purposes Only: The articles, cost comparisons, square footage price ranges, R-value figures, energy savings estimates, and building code citations published on this website are provided strictly for general educational and editorial reference. They do not constitute certified engineering advice, architectural specifications, official building envelope evaluations, or a binding offer to contract.

2. Site-Specific Engineering Variability: Fire-protective coatings require certified on-site substrate inspection, environmental moisture testing, and custom assessment. Actual project pricing, required material thickness, building code compliance (including the Ontario Building Code and CAN/ULC standards), and municipal inspection approvals vary based on structure type, accessibility, existing substrates, ventilation, and municipal building authority jurisdictions.

3. Absolute Precedence of Written Contract: No statement on this website shall be construed as a binding guarantee, performance warranty, or contractual representation by Sprayfoam Solutions Toronto Inc. Final binding scope of work, project specifications, and certified pricing are established exclusively through a formal, signed written quote provided by an authorized Sprayfoam Solutions estimator following an on-site or certified architectural plans review. All terms, conditions, and warranties set forth in the formal written contract strictly and absolutely supersede all prior or contemporaneous verbal discussions, emails, text messages, blog articles, and online representations. For complete terms, visit our Terms of Service.

CONTINUE READING • ONTARIO INSULATION & FIRE COATING GUIDES

Related Articles

Spray Foam
Basement Spray Foam Cost Ontario (2026) | Price in 60s

Basement Spray Foam Cost Ontario (2026) | Price in 60s

Read Article
Fire Coatings
Intumescent Steel Fire Coating in Markham: Architect's Guide

Intumescent Steel Fire Coating in Markham: Architect's Guide

Read Article
Spray Foam
Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Water Storage Tank, Fire Cistern & Industrial Silo Spray Foam Insulation Cost in Ontario (2026 Contractor Guide)

Read Article
Fire Coatings
Structural Steel Fire Rating Requirements in Ontario

Structural Steel Fire Rating Requirements in Ontario

Read Article
Commercial
How to Insulate a Commercial or Residential Metal Roof in Ontario: 2026 Spray Foam Cost & R-Value Guide

How to Insulate a Commercial or Residential Metal Roof in Ontario: 2026 Spray Foam Cost & R-Value Guide

Read Article
Fire Coatings
Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Intumescent Fire Coating Ontario (2026 Steel & Spray Foam)

Read Article
SERVING ALL ONTARIO:Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock•Ajax • Aurora • Barrie • Belleville • Bracebridge • Brampton • Brant • Brantford • Brock • Brockville • Burlington • Caledon • Cambridge • Chatham-Kent • Clarington • Collingwood • Cornwall • East Gwillimbury • Etobicoke • Fort Erie • Gravenhurst • Grimsby • Guelph • Halton Hills • Hamilton • Huntsville • Innisfil • Kawartha Lakes • King • Kingston • Kitchener • Lincoln • London • Markham • Milton • Mississauga • Muskoka • Newmarket • Niagara Falls • North York • Oakville • Orillia • Oshawa • Ottawa • Parry Sound • Pelham • Peterborough • Pickering • Port Colborne • Richmond Hill • Sarnia • Scarborough • Scugog • St. Catharines • St. Thomas • Stratford • Thorold • Toronto • Uxbridge • Vaughan • Wainfleet • Waterloo • Welland • West Lincoln • Whitby • Whitchurch-Stouffville • Windsor • Woodstock

About Sprayfoam Solutions Toronto Inc

6,500+ projects completed since 2008. The Greater Toronto Area's trusted spray foam insulation & fireproofing contractor for commercial builders, general contractors, and homeowners.

647-333-3626Request a Quote
50 Howden Rd, Scarborough, ON M1R 3E4
100% Canadian Owned & OperatedLicensed • Up to $10M Insured • WSIB Clearance

Our Services

  • ›Spray Foam (Residential)
  • ›Spray Foam (Commercial)
  • ›Interior Sound Dampening
  • ›Fire Coating DC315
  • ›Cementitious Fireproofing
  • ›Intumescent Coating

Expert Guides

  • What is Spray Foam Insulation?
  • How Much Does Spray Foam Cost?
  • Our Chemicals & Technical Data
  • Customer Reviews (5.0 ★)
  • View Our Projects
  • Book Free On-Site Inspection

Areas We Serve

  • •Toronto & Central GTA
  • •Mississauga & Peel
  • •Oakville & Halton
  • •Vaughan & York Region
  • •Barrie & Simcoe County
  • •Muskoka & Cottage Country
  • •Waterloo & Tri-Cities
  • •Oshawa & Durham Region
  • + View All 50+ Cities
All project estimates, pricing illustrations, R-value metrics, and building code references on this website are for general informational purposes only and do not constitute a certified estimate or binding offer to contract. Formal written contracts provided by Sprayfoam Solutions Toronto Inc. following an on-site inspection strictly supersede all online representations. Subject to our Terms of Service and Privacy Policy.
AboutView Our WorkCustomer Reviews 5.0 ★CertificationsServicesAreas We ServeBlogContact UsTerms of ServicePrivacy Policy
© 2026 Spray Foam Solutions Toronto Inc. All Rights Reserved.